Similar Projects
Last Updated | 07/20/2023 11:10 AM |
Project Title | RFP Engineering - PD&E Study, SR 401 Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Cape Canaveral, FL 32920 (Brevard County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Feasibility Study, Construction start expected June 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of July 19, 2023, information regarding award and award date has not been disclosed. This project is currently in the feasibility study phase. Although a firm timeline has not been established, design is estimated to take place in 2023-2024. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Oral Presentation PD&E Study, SR 401 Bridge Replacement TRC Members (Subject to Change) : Ed Kestory Todd Long William Walsh The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. Financial Management Number(s) 444787-1-22-01 Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Oral Presentation Date: 11/12/2020 8:30AM Longlist Date/Time 10/28/2020 06:30 pm Shortlist Selection Date/Time 11/02/2020 08:00 pm Technical Review Committee Meeting 1 Date/Time 11/12/2020 08:00 pm Technical Review Committee Meeting 2 Date/Time 11/12/2020 10:30 pm Technical Review Committee Meeting 3 Date/Time 11/13/2020 01:30 am Final Selection Date/Time 12/07/2020 08:00 pm Negotiations Period Begin Date 12/09/2020 Negotiations Period Ending Date 2/09/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - PD&E Study, SR 401 Bridge Replacement |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |