Similar Projects
Williams Street Multifamily Development
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

Cedar Swamp Force Main & Pump Station Rehabilitation - City of Warwick
Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

Bridge Group 33A - I-295 Providence St
Demolition, New Construction, Infrastructure
Bidding
$700,000 CJ est. value
West Warwick, RI 02893

Post-Type Fire Hydrants
Term Contract
Post-Bid
Warwick, RI

Brass Fittings and Valves
Term Contract
Post-Bid
Warwick, RI

Installation of Water Meter Chamber
Infrastructure
Results
West Warwick, RI

Woodsprings Suites - Post Road / Warwick
New Construction, Infrastructure
Pending Verification
$30,400,000 CJ est. value
Warwick, RI 02886

Post Road Contractor Storage Building
New Construction, Infrastructure - 70,000 SF
Pending Verification
$7,600,000 CJ est. value
Warwick, RI 02888

GAPS Sewer Extensions - City of Warwick
Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Cumberland Farms Car Wash - Fessenden Street / Warwick
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Warwick, RI 02886

Warwick Sewer Data Transmission - City of Warwick
Infrastructure
Conception
$1,500,000 CJ est. value
Warwick, RI 02889

Site Improvements at Shawomet Terrace
Infrastructure
Post-Bid
Warwick, RI 02889

Post Road Multifamily Development
New Construction, Infrastructure
Pending Verification
$75,400,000 CJ est. value
Warwick, RI 02886

BNR Diffuser, Actuators and IR piping System Upgrade - City of Warwick
Infrastructure
Conception
$2,100,000 CJ est. value
Warwick, RI 02889

Last Updated 09/07/2022 11:02 AM
Project Title

Gravity Thickner #1, #2 & Odor Control Rehabilation - City of Warwick

Physical Address View project details and contacts
City, State (County) Warwick, RI 02889   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $725,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of the project or A detailed scope has not yet been determined Gravity Thickner #1, #2 & Odor Control Rehab Project is included in the City of Warwick's FY 2023-2025 CIP. As of September 7, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in FY 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents