Similar Projects
Beaver Creek New Raw Water Pump Station And Intake - Rivanna Water and Sewer Authority
New Construction, Infrastructure
Conception
$15,152,000 est. value
Charlottesville, VA

Water Treatment Services: Inspection and Testing (Step 2)
Post-Bid
Commonwealth, VA

New Water Main Installation on Grove Avenue
Post-Bid
Charlottesville, VA

Annual Water Meter Replacement
Term Contract
Results
Charlottesville, VA

On-Call Maintenance Construction Services
Term Contract
Results
Charlottesville, VA

Underground Utility Locating Services
Term Contract, Infrastructure
Post-Bid
Charlottesville, VA

Annual Water System
Term Contract
Results
Charlottesville, VA

New Water Main Installation - Stonefield Lane
Infrastructure
Post-Bid
Charlottesville, VA

City Backflow Preventer Install
Results
Charlottesville, VA

Four-story Backflow Prevention Assembly Retrofit Project
Infrastructure
Post-Bid
$300,000 est. value
Charlottesville, VA

Dry Hydrant Installation/Repair Program - Zone 1
Term Contract
Results
Charlottesville, VA

Dry Hydrant Installation/Repair Program - Zone 2
Term Contract
Results
Charlottesville, VA

Dry Hydrant Installation/Repair Program - Zone 3
Term Contract
Results
Charlottesville, VA

Broadus Wood Elementary School Well System Improvements
Results
$300,000 to $400,000 est. value
Earlysville, VA 22936

Jefferson Village Water Main Replacement
Infrastructure
Results
Charlottesville, VA

Reported 07/05/2022 10:58 AM
Project Title

Moore's Creek Advanced Water Resource Recovery Facility Digester Replacement/Repair - Rivanna Water and Sewer Authority

Physical Address View project details and contacts
City, State (County) Charlottesville, VA 22902   (Albemarle County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a water / sewer project in Charlottesville, Virginia. Conceptual plans call for the renovation of a water / sewer project. Moores Creek AWRRF has five digester vessels. The two smaller digesters were part of the original 1958 plant construction. The three larger digesters were part of the 1979 plant upgrades following construction of the bridge over Moores Creek and the south side of the plant. Although numerous upgrades have been constructed at the digester complex over the last 11 years (including heating, mixing, gas compression, and roof repairs), the overall condition of the concrete and complex is reaching its useful life. Furthermore, through the Moores Creek master planning process, Hazen has identified future plant improvements which will need to 34 be installed in this area. This project includes addressing remaining repairs to the existing digester complex, including safety repairs, to extend the useful life approximately 10-15 years while RWSA plans, designs, and constructs a new digester complex at another location on the Moores Creek site. This project is in included in the Rivanna Water and Sewer Authority FY 2023-2027 Capital Improvement Plan (CIP). As of July 01, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents