Similar Projects
MCSTOPPP Full Trash Capture Device - 205.5 - City of San Rafael
New Construction, Infrastructure
Conception
$1,009,000 CJ est. value
San Rafael, CA 94901

Marin City Pond and Drainage Improvements - Zone 3 - Marin County
Infrastructure
Conception
$14,100,000 CJ est. value
San Rafael, CA 94901

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

Haz-Mat Abatement and Demolition of Existing City Owned Building
Term Contract, Demolition, Infrastructure
Design
$213,200 CJ est. value
West Covina, CA 91791

Tree Mortality Program Project 42
Term Contract
Bidding
San Andreas, CA 95249

Master As-Needed Agreement M21 Tree Services
Term Contract
Sub-Bidding
$2,000,000 CJ est. value
San Francisco, CA 94103

Master As-Needed Agreement M20 Tree Services
Term Contract
Sub-Bidding
$700,000 CJ est. value
San Francisco, CA 94103

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

Gopher Abatement Services
Alteration
Post-Bid
$35,000 est. value
Redlands, CA

Asbestos Abatement
Alteration
Results
$40,000 est. value
Chico, CA 95928

Lead Abatement and Exterior Painting at Two School Sites
Alteration
Results
$50,000 est. value
El Segundo, CA

San Rafael High School Portable Removal Project
Demolition, Infrastructure
Construction
$196,598 CJ est. value
San Rafael, CA 94901

RFQ Contractor - Biosolids Digester Facilities - T-31.06 Shoring Demolition
Demolition, Infrastructure
Pending Verification
$60,000 CJ est. value
San Francisco, CA 94103

Headwaters Corner - Mountains Restoration Trust/TreePeople
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Calabasas, CA 91302

Riverside Ponds River Restoration - City of Calistoga
Infrastructure
Conception
$375,000 CJ est. value
Calistoga, CA 94515

Last Updated 01/05/2024 02:41 PM
Project Title

San Antonio Pump Station Motor Control Center Replacement and Seismic Retrofit

Physical Address View project details and contacts
City, State (County) Sunol, CA 94586   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $8,830,009 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 5, 2024, the project has not been awarded. A timeline for award has not been confirmed. Replacement of motor control centers and appurtenant equipment, and seismic upgrade of the San Antonio Pump Station The Local Business Enterprise (LBE) subcontracting requirement is 11.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs and SFPUC Micro & Small-LBEs. The LBE subcontracting participation requirement is under 20% because a large portion of the work involves highly specialized equipment that needs to be purchased and installed, and due to the project location of 50 miles from San Francisco with limited LBE availability. For all questions regarding the prevailing wage requirements, email: olseprebidprecon@sfgov.org All questions go to: QBD@sfwater.org All questions below this line were received after the 10 days prior to bid deadline

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents