Similar Projects
Lift Station Flood Plain Mitigation Project
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Clearwater, FL 33762

RFQ D/B - Install Additional Pump on OR Chilled Water Loop
Renovation
Bidding
$250,000 CJ est. value
West Palm Beach, FL 33410

Purchase and Installation of Lift Station Pumps
Renovation
Sub-Bidding
$30,000 CJ est. value
Dania Beach, FL 33004

Justice Center Tower Plumbing Replacement
Renovation
Post-Bid
Fort Myers, FL 33901

Hot Water Plumbing - 4th Floor At The Hyatt Regency Orlando International
Alteration
Post-Bid
Orlando, FL 32827

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement
Results
$250,000 to $500,000 est. value
Tampa, FL

Commercial Plumbing Service and Fire Sprinkler Repair and Parts Services
Alteration
Results
Orlando, FL

S Lake Huntley Line Extension
Infrastructure
Bidding
$300,000 CJ est. value
Lake Placid, FL 33852

RFQ D/B - Design-build Services for Southwest Water Reclamation Facility Second Cloth Media Filter
Renovation
Post-Bid
$4,390,000 CJ est. value
Bradenton, FL 34210

Plumbing Services for USF
Alteration
Results
Saint Petersburg, Sarasota, Tampa, FL 33620

Infusion Pumps - HHMC Daytona Campus
Infrastructure
Post-Bid
Daytona Beach, FL 32114

Plumbing Construction - Countywide
Term Contract
Results
FL

Ice Pigging Piping Maintenance or Orange County Utilities Field Services Division
Alteration
Post-Bid
FL

Citywide Plumbing Services
Alteration
Results
Titusville, FL

Drinking Fountains-DESO
Term Contract, Alteration
Post-Bid
Bradenton, FL 34209

Last Updated 06/30/2023 01:05 PM
Project Title

South Sewall's Point Road Watermain (Phase 3 Area) and LPFM (Phases 3 & 4) Improvements

Physical Address View project details and contacts
City, State (County) Sewalls Point, FL 34996   (Martin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Town is proposing the replacement of the existing water mains in the South Sewall's Point Phase 3 Area (Rio Vista/Homewood/Via Lucinda/Ridgeland) and the installation of new Low Pressure Sewer Mains (LPFMs) in South Sewall's Point Road from the same Phase 3 Area to East Ocean Blvd. These improvements will include new water mains, new water services, tie-ins to existing water mains, new LPFMs, new LPFM services and all fittings and appurtenances needed to complete the project. These improvements are being performed ahead of the proposed South Sewall's Point Roadway/Drainage Improvements. The Roadway/Drainage improvement design is being included as reference to ensure utilities are being constructed to avoid conflicts with the future improvements. It is expected that this work will be completed utilizing directional drilling to avoid significant restoration of roadway/landscape areas. The resulting contract shall be awarded to the lowest, responsive and responsible bidder whose total base bid includes the requirements and criteria set forth in this ITB and whose award will be in the best interest of and most advantageous to the Town of Sewall's Point, taking into consideration; Base Bid amount, the financial responsibility of the bidder, quality of materials, personnel and equipment resources, proven skill and experience, abilities to timely perform the contract, previous satisfactory performance and such other abilities of the bidder that the Town, in its sole discretion, determines will enable it to perform effectively and efficiently the contract being bid upon. Bids must be accompanied by a Bid Bond/Security in the amount of ten percent (10%) of the Bid and must accompany each Bid in accord with the Instructions to Bidders. The successful Bidder, who is awarded the contract, will be required to furnish a 100% Construction Payment and Performance Bond meeting the requirements of Section 255.05 Florida Statutes. No bidder may withdraw his or her bid for a period of ninety (90) days after submission by the date set for the opening thereof. The Town, in its sole discretion, reserves the right to waive all minor technicalities or irregularities, to reject any or all bids or any part of a bid, to award to a single bidder or to divide the award between bidders, and to re-solicit this bid or any part of this bid. The Town further reserves the right, in its sole discretion, to award a contract to the bidder (or bidders) whose bid best serves the interests of the Town. In general, this bid is for the Phase 3 Area of S. Sewall's Point. The Town and Contractor may agree to utilize these unit prices in subsequent Phase 2, Phase 1 & Phase 4 areas of the water and sewer improvements.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents