Similar Projects
Cold Inplace Recycle, Mill and Overlay and Intersection Lighting Revisions - TH 18
Infrastructure
Conception
$4,300,000 CJ est. value
Finlayson, MN 55735

Cold Inplace Recycle, Mill and Overlay and Intersection Lighting Revisions - TH 18
Infrastructure
Conception
$4,300,000 CJ est. value
Finlayson, MN 55735

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Foundation Repairs and Grading Modifications
Infrastructure
Post-Bid
Pine City, MN

2021 Street Improvements
Infrastructure
Results
$3,000,000 est. value
Pine City, MN

Phase XIX Hazardous Soil Excavation, Transportation and Disposal at Former Kettle River Co Creosote
Infrastructure
Results
$509,423 CJ est. value
Sandstone, MN 55072

Rydberg & Sons Inc Outdoor Storage
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Pine City, MN 55063

Rydberg & Sons Inc Outdoor Storage
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Pine City, MN 55063

2022 Pavement Improvements
Infrastructure
Post-Bid
$507,000 est. value
Pine City, MN

2023 Mill and Overlay Project
Infrastructure
Results
$414,915 CJ est. value
Sandstone, MN 55072

Pine City Apartments
Renovation
Pending Verification
$5,000,000 CJ est. value
Pine City, MN 55063

Work Associated With the Maintenance of the Townships Approximately 49 Miles of Roads
Infrastructure
Post-Bid
$5,000,000 est. value
Sturgeon Lake, MN

Grading and Bituminous Surfacing
Infrastructure
Results
$1,084,575 CJ est. value
Sandstone, MN 55072

6th Avenue Student Housing
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Pine City, MN 55063

Alma Razor Road Rehabilitation
Infrastructure
Post-Bid
$600,000 est. value
Hinckley, MN 55037

Last Updated 07/20/2023 05:43 PM
Project Title

Hilltop Apartments

Physical Address View project details and contacts
City, State (County) Pine City, MN 55063   (Pine County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major quantities for the Work include: Est. Qty Unit Item 1 LS Site grading and restoration 400 SF Replace 6-inch and 8-inch CMU 30 EACH Anchor Bolts 60 SF Exterior Grade Sheeting 3,100 SF Re-Tuck CMU 2400 SF Remover and replace concrete walk . Bids will ONLY be received electronically. Contractors submitting an electronic bid will be charged an additional $42 at the time of bid submission via the online electronic bid service QuestCDN.com. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Pine City HRA reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the HRA.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents