Similar Projects
Reported | 06/04/2022 12:00 AM |
Project Title | Install Door IG Offices Building 10480 - Joint Base Elmendorf-Richardson (JBER) |
Physical Address | View project details and contacts |
City, State (County) | Anchorage, AK 99505 (Anchorage County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $25,000 to $100,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This is the official Pre-solicitation/Synopsis for the subject project. Project consists of work to remove an existing door and install a new fire rated glass door at the Inspector General's (IG) Office main entrance in Building 10480. PROJECT DESCRIPTION: Project consists of work to Intent is to remove an existing door and install a new fire rated glass door at the Inspector General's (IG) Office main entrance in Building 10480, refer to drawings provided. This project shall be accomplished as an Open Market Project. The Contractor shall provide shop drawings for review prior to beginning work. There has previously been asbestos containing material (ACM) and lead based paint (LBP) detected in this facility. Testing must be completed before construction start. If ACM or LBP is detected in areas of repair, contact 673 CONS Contracting Officer. Whenever remediation is required, it shall be limited to the minimum area necessary to satisfactorily complete the associated repair. 1.2 PROJECT LOCATION: Joint Base Elmendorf-Richardson (JBER) is located on the northern edge of Anchorage, Alaska and is accessible from the Glenn Highway at Boniface Parkway. The project location is on the Elmendorf side of the installation at Building 10480. 1.3 UNIQUE REQUIREMENT: Project is to be implemented while Facility is in use throughout the construction. Contractor shall request approval of any downtime/outages a minimum of 10 work days in advance. Of particular importance is the necessity to protect users and occupants of the facility from falling debris and life safety issues. Contractor staging areas will be identified by the Facility Manager, Fire Department, and 673 CES/CENMP. Safety areas and caution notices are to be provided by the Contractor. The IG Offices must remain secured/lockable at all times, so if there is a time when the room will be without a The method of contractor selection has not been determined at this time. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |