Project Title | Repairs of 70 Earthquake Damaged Schools |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT 84115 (Salt Lake County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The CM/GC Work for the project consists of two (2) phases: Pre-construction and Construction. A. Preconstruction Phase: This phase of the Work includes, but is not limited to, attending design meetings, estimating and cost control, schedule development, and drawing/constructability reviews. The Construction Manager shall provide a full construction estimate at the design development design phase prior to issuance of final construction documents to assist the Owner and Design Consultant in maintaining the cost of construction within the FLCC and the duration of the construction within the project’s schedule. The Construction Manager shall monitor the bid climate and make recommendations to the design team as to the most advantageous bidding time/schedule and then solicit bids from sub-contractors. B. Construction Phase: This phase of the Work consists of the Contractor furnishing and installing all work as required in the Contract Documents. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |