Similar Projects
Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

WRF Expansion Construction
New Construction
Conception
$1,800,000 est. value
Casa Grande, AZ

Water Reclamation Facility #6 Phase 1
New Construction
Design
$12,000,000 est. value
Buckeye, AZ

Wastewater Treatment Plant Headworks Improvements
Renovation
Design
Prescott Valley, AZ

RFQ Construction Manager at Risk - Trillium Water Reclamation Facility Phase 1
New Construction, Infrastructure
Bidding
$30,000 CJ est. value
Buckeye, AZ 85326

Polymer Injection Unit for Wastewater Facility
Renovation
Bidding
$200,000 CJ est. value
Sierra Vista, AZ 85635

RFQ Design - Signal Butte Water Treatment Plant Expansion (SBWTP)
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85212

Medium Coarse Headworks Bar Screen And Washer
New Construction
Post-Bid
Somerton, AZ

Construction Manager at Risk Services Tres Rios Headworks Biofilter Odor Control
Results
Tucson, AZ

City Elevator Upgrades South Tempe Water Treatment Plant (STWTP) and Johnny G. Martinez Water Treatment Plant (JGMWTP) Project
New Construction
Results
$442,860 est. value
Tempe, AZ 85281

Central WWTP Improvements Phase 2
Renovation
Construction
$2,500,000 est. value
Buckeye, AZ

Transfer Station
New Construction - 10,500 SF
Pending Verification
Gilbert, AZ

Northern Wastewater North Gateway Infrastructure - WS90500236 - City of Phoenix
New Construction
Pending Verification
$6,778,010 CJ est. value
Phoenix, AZ 85032

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

District 6 St. John's Waste Water Treatment Facility Expansion and Lift Station Upgrade
Addition, Demolition, Renovation, Infrastructure
Design
$300,000 CJ est. value
Phoenix, AZ 85041

Last Updated 11/16/2022 10:04 AM
Project Title

Treatment Plant Headworks Improvement - City of Prescott Valley

Physical Address View project details and contacts
City, State (County) Prescott Valley, AZ 86314   (Yavapai County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 16, 2022, an engineer has been selected and the project is in the design phase. Construction is estimated to take place in the 2023-2024 fiscal year. *The closed solicitation has been included below for reference: The Town of Prescott Valley is seeking Statements of Qualifications to provide professional engineering services for the Wastewater Treatment Plant Headworks Improvements Project, CIP #WW495. The scope of work includes preparing a feasibility/design study, and conceptual and final designs for improving the WWTP headworks process, including adding grit removal and updating the screenings system, influent flow metering and other ancillary processes, including adding additional tertiary filters. The procurement of professional services for this Project is governed by the provisions of A.R.S. §34-603. Award of a single contract for this Project shall be based on demonstrated competence and qualifications for the type of professional services specified. All applicable Federal Laws, State Laws, Municipal Codes, and other applicable rules and regulations of authorities having jurisdiction over said Project shall apply throughout. A copy of the Request for Qualifications (RFQ) packet may be obtained from the Prescott Valley website at www.pvaz.net, under “Bids & RFQs”, and www.publicpurchase.com. Please contact Randy Perham, P.E., Utilities Engineer, with any questions at (928) 759-3070, or at rperham@pvaz.net. As of May 6, 2021 this project is seeking qualifications. Bidding for contractors and a firm construction start date have not been established. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents