Similar Projects
Hot Water Storage Tanks Replacement Project
Renovation
Bidding
$500,000 CJ est. value
Aspen, CO 81611

Construction of the Silverton Road Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Colorado Springs, CO 80921

2023 - Colorado Boulevard Bridge Approach Slab Repairs
Infrastructure
Sub-Bidding
$504,702 CJ est. value
Centennial, CO 80112

Prairie Hawk Early Grading South
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Denver, CO 80202

Concrete Contractors for Pouring Concrete Slabs at the Alamosa K-2 Elementary School
Post-Bid
Alamosa, CO 81101

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

Operations On-Call Concrete Replacement and Repair
Alteration
Results
Lafayette, CO

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

RFP D/B - Mount Zion Trailhead Improvement Design-Build Project
Infrastructure
Bidding
$195,000 CJ est. value
Golden, CO 80401

Concrete Repairs and Replacement Services
Term Contract
Post-Bid
Westminster, CO

Precast Foundations
Alteration
Results
Fort Collins, CO

Construction of the Calhan Highway Bridge Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$350,000 CJ est. value
Calhan, CO 80808

Berthoud Brick Stair Repair
Alteration
Post-Bid
$200,000 est. value
Golden, CO 80401

2022 Concrete Replacement Project
Infrastructure
Results
Aspen, CO

Last Updated 07/01/2023 07:35 AM
Project Title

DHS Drainage Correction Project

Physical Address View project details and contacts
City, State (County) Fort Morgan, CO 80701   (Morgan County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000320582 The project involves modifications to the Departments of Human Services Parking lot and sidewalks. Purpose of the project is to reduce damage and/or pooling of water in specific areas. This project will need to be done in sections/areas/phases with areas of the highest order to be completed first. All work must comply with the drainage study. Bid Intent Not Available Question Acceptance Deadline 06/15/2023 02:00 AM EDT Questions are submitted online No Bonding Requirements - Bid Bond 100 % - Performance Bond 100 % Contact Information Karla Powell 9705423500 ext. 1410 kpowell@co.morgan.co.us All contract work must be completed on or before October 31, 2023. The project involves modifications to the Departments of Human Services Parking lot and sidewalks. Purpose of the project is to reduce damage and/or pooling of water in specific areas. This project will need to be done in sections/areas/phases with areas of the highest order to be completed first. All work must comply with the drainage study in Exhibit A. Area 1 Main Entryway: The main entryway Is located on the northwest side and is highest area of concern. The walkway may be narrowed and regraded. This walkway is connected to the parking lot and a fall in grade may be necessary. Areas on either side of the walkway should be regraded to control runoff and keep water off the walkway. New gutters for the entire building are necessary to route water away from the building. Current soil located at the front entrance of DHS, shall be replaced with non-expansive soil. The proposal shall address the phases of this portion of the project to ensure client accessibility to the building. No curbs will be added to the front parking lot due to ADA Regulations. Area 2, 3 & 4 Northeast & Northwest Parking Lot: The northwest parking lot will be entirely repaved with concrete to ensure better grading of the flat work and reduce water collection areas. Remove asphalt in the parking lot and replace with concrete. A new sidewalk will be installed and constructed additionally. Area 5 East Parking Lot: The building slab on the eastside of the building should be replaced to drain away from the building. Existing concrete under transformer will not be disturbed. The new slab should be constructed with a grade adjustment to ensure water drains away from the building. Modifications to the curb/sidewalk to create ADA compliant entrance, including transition from the parking lot. Adjacent parking lot asphalt will be removed and replaced with concrete.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents