Similar Projects
H335--Underground Storage Tank Inspection and Maintenance Services
Term Contract
Post-Bid
Hines, IL 60141

Briar Lane Elevated Water Storage Tank Maintenance and Repainting
Infrastructure
Results
Less than $564,800 est. value
Oak Forest, IL

Union Pacific Water Tower - Proviso Yard And Global II
Alteration
Post-Bid
Melrose Park, IL 60160

Maple Street Reservoir Fill Improvements
Infrastructure
Results
Des Plaines, IL

New Elevated Water Storage Tank (Oakton and Busse)
Infrastructure
Results
$5,286,862 est. value
Elk Grove Village, IL

Four Flaggs Tank Rehab, Painting and Tower Facilities Lightning Protection and Oriole Tower Lightning Protection
Infrastructure, Alteration
Results
Niles, IL 60714

Potable Water Reservoir
Infrastructure
Post-Bid
Broadview, IL 60155

Elevated Water Tanks 6 and 4 Rehabilitation
Infrastructure
Results
Orland Park, IL 60462

13 North Tank and 16 East Tank
Infrastructure
Results
Arlington Heights, IL 60004

Rodenburg Maint CIF AST Storage Tank
Infrastructure
Post-Bid
Schaumburg, IL

1.0 MG Elevated Water Storage Tank
New Construction
Results
$4,343,400 to $5,298,000 est. value
Lemont, IL 60439

Dewatering and Cleaning - 2 Million Gallon Semi-Submerged Concrete Lined Water Reservoir
Infrastructure
Results
Schaumburg, IL

North of Willow Stormwater Projects
Infrastructure
Results
$19,642,172 CJ est. value
Winnetka, IL 60093

Elevated Water Tanks 8 & 10 Rehabilitation
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Orland Park, IL 60462

City Hall UST Removal and Replacement
Infrastructure
Bidding
$900,000 CJ est. value
Des Plaines, IL 60016

Last Updated 10/13/2022 12:35 PM
Project Title

Elevated Tank Riser Pipe Replacement

Physical Address View project details and contacts
City, State (County) Calumet City, IL 60409   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Furnish and install fully painted, insulated, and jacketed riser pipe. Removal of existing riser pipe. Alternate bid for replacement of CBI expansion joint. Contracts for work under this bid will obligate the contractor and sub-contractors not to discriminate in employment practices and shall be in compliance with applicable State of Illinois Statutes pertaining to the selection of labor and the prevailing rate of wages. Bidding Documents may be downloaded from the designated website. Prospective Bidders shall register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. A certified check or bank draft payable to the order of the Treasurer, Calumet City, Illinois, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Base Bid for the Divisions bid shall be submitted with each Bid. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids will be held good for a period of thirty (30) days subsequent to the opening of Bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents