Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

UDOT Drainage Repair US 89 MP 340.10 on the Left Side of the Road
Infrastructure
Bidding
Orem, UT 84097

DFCM Construction - Pre Qualified General - UDOT Tooele County Maintenance Stations
Infrastructure
Bidding
$312,000 est. value
Grantsville, Tooele, Wendover, UT 84029

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

500 East 600 South Design
Post-Bid
Salem, UT 84653

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah
Results
$500,000 to $1,000,000 est. value
Mexican Hat, UT

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Construction of the 400 East Storm Drain Rehab Phase 1
Post-Bid
Saint George, UT 84770

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

Remove and Replace Approximately 110` of 14" Irrigation Culvert or Pipe
Post-Bid
Hinckley, UT 84635

Arch Hydroseeding - Salt Wash Soil Stabilization and Revegetation
Results
Moab, UT 84532

Replacement of the Existing Water Diversion Structure of the Bench Canal Heading
Post-Bid
Duchesne, UT

Trail Mountain Emergency Watershed Protection
Results
Castle Dale, UT 84513

Last Updated 08/13/2021 04:57 PM
Project Title

Willow Creek BDAS

Physical Address View project details and contacts
City, State (County) Vernal, UT   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results, All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work alongside DWR staff for stream rehabilitation project. Located 75 miles north of Vernal in Uintah County. The project is located on Willow Creek in Grand County, Utah. We are seeking a small (4-6 person) chainsaw/labor crew to work during a stream rehabilitation project. We will hire the crew on an hourly basis and can keep the crew employed until our budget of $22,000 is reached or the project ends. Bids must include the number of personnel in the crew and the cost per/hour for the crew. The bid will be judged according to the total number of man-hours provided. The time period of the project is October of 2021. Access to the site: Willow Creek is located about 75 miles south of Vernal, Utah. The site is reached by heading west from Vernal on Highway 40 and then turning south on Highway 88 and continuing to Winter Ridge then heading west about 20 miles to the worksite. HWY 88 is paved but winter ridge is not. A four-wheel-drive vehicle is recommended to reach the project location.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents