Similar Projects
Managed Parking
Post-Bid
Green Mountain Falls, CO

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Homestead Trail Project
Results
Less than $100,000 est. value
Colorado Springs, CO 80917

Ada Curb Ramp Retrofit Upgrades, including Removal of Sidewalk
Results
$1,000,000 to $5,000,000 est. value

Sidewalk and Drainage Improvements on El Monte Place
Infrastructure
Post-Bid
Manitou Springs, CO 80829

Upper Meadows Trail Project
Results
Less than $40,000 est. value
Colorado Springs, CO

Concrete and Asphalt Repairs at Timberview Middle School , Rockrimmon Elementary School and Pioneer Elementary School
Infrastructure
Post-Bid
Colorado Springs, CO 80919

FCF ADA Improvements - Phase 1
Results
Less than $1,500,000 est. value
Colorado Springs, CO

2021 CDBG Southmoor Drive ADA Sidewalk Improvements Project
Infrastructure
Post-Bid
Fountain, CO 80817

Old Broadmoor and Lake Roundabout Modification
Results
Colorado Springs, CO

Sand Creek Trail Crossing at Hancock
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Colorado Springs, CO 80902

Sidewalk Improvements on Canon and Park Avenue
Results
Manitou Springs, CO 80829

PikeRide Expansion Construction Project
Infrastructure
Post-Bid
$200,000 est. value
Colorado Springs, CO

ADA Accessibility Improvements at the El Paso County Fairgrounds
Results
Less than $138,800 est. value
Calhan, CO 80808

North Cheyenne Canon Powell Trailhead Parking Lot Construction
Results
Less than $320,000 est. value
Colorado Springs, CO

Last Updated 05/03/2022 11:38 AM
Project Title

Bus Stop Pad Replacement

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking bids from qualified concrete contractors to remove and replace existing concrete bus stop pads to conform with ADA requirements and regulations. All stops are in or adjacent to limited or middleincome neighborhoods as defined by City of Colorado Springs Community Development. A total of twenty-five stops are identified for replacement of which twentytwo are bench pads and three are shelter pads

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents