Similar Projects
Last Updated | 06/16/2020 10:23 AM |
Project Title | 2020-CT-008 Statewide Pavement Striping - Central |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: RI |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate - 04/07/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of new edge line, skip line, gore area, arrow, word, stop line, yield line, crosswalk and other pavement markings at the same locations of existing markings (hereafter referred to as "replacement" work and the installation and removal of pavement markings at other locations to be determined by the Department after Contract award (hereafter referred to as "as needed" work, all in conformance with the latest Manual or Uniform Traffic Control Devices and its latest revisions. Also included in this contract is temporary traffic control on all roadways in conjunction with the striping work, removal of all types of pavement markings and other incidentals necessary the work in accordance with Contract requirements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |