Similar Projects
Repair & Improvement to County Ditch No. J21
Infrastructure
Bidding
$726,215 CJ est. value
Albert Lea, MN 56007

Bassett Drive Watermain Extension
Infrastructure
Bidding
$600,000 CJ est. value
Mankato, MN 56001

Water Softener Installation
Post-Bid
Faribault, MN

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

Plumbing Service
Term Contract
Results
$250,000 est. value
Moorhead, MN

General Contractor for 1314 North 44th Avenue Piping
Alteration
Results
Minneapolis, MN 55412

Pipe Insulation
Term Contract
Post-Bid
MN

Century High School - Pool Addition - Bid Package 02
Alteration
Results
Rochester, MN 55906

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

2021 Plumbing Infrastructure Upgrade Program
Alteration
Results
Minneapolis, MN

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Results
MN

Plumbing Services 2022
Alteration
Post-Bid
Saint Paul, MN

Last Updated 12/22/2022 12:06 AM
Project Title

Lime Lake Rock Arch Rapids Installation

Physical Address View project details and contacts
City, State (County) Slayton, MN 56172   (Murray County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Civil Engineer - 11/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The scope of work consists of furnishing and installing the following approximate quantities: 1 LS Mobilization 90 LF Flotation Silt Curtain 1 LS Remove Existing Dam 660 CY MnDOT Class II Riprap 955 CY MnDOT Class III Riprap 550 LF Rock Weir (36" to 60" Diameter Boulders) 10 EA Rock Boulders (36" to 60" Diameter Boulders) 4 EA Flat Rock Boulders (48" to 72" Diameter) 1 LS Clearing and Grubbing 1 LS Seeding and Mulching All contract work shall be completed by December 1, 2023, with the exception of Seeding and Mulching. Seeding and Mulching shall be completed by June 15, 2024.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents