Similar Projects
Reported | 07/10/2019 12:00 AM |
Project Title | Construction of the Pine Gully and Hester’s Gully Water Line Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Seabrook, TX 77586 (Harris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $250,000 to $265,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Todville Road at Pine Gully The existing 8 inch water line is to be removed from the bridge and capped underground. A new 12 inch HDPE water line is to be installed under Pine Gully by directional drill. Additionally, an air release valve is to be placed on one end of the line as shown on the plans. Replacement of this line will provide a more secure location to a section of water line that is difficult to provide maintenance on, due to its location on Pine Gully bridge. Todville Road at Hester’s Gully The existing 8 inch water line is to be removed from the bridge and capped underground. A new 12 inch HDPE water line is to be installed under Hester’s Gully by directional drill. Additionally, an air release valve is to be placed on one end of the line as shown on the plans. Replacement of this line will provide a more secure location to a section of water line that is difficult to provide maintenance on, due to its location on Hester’s Gully bridge. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |