Similar Projects
Signing and Delineation
Infrastructure
Conception
$1,019,000 CJ est. value
Martin, SD 57551

Shoulder Widening, Replace Str RCBC, Approach Grading, Modify Intersection, Pipe Work; Signal
Infrastructure
Conception
$19,197,000 CJ est. value
Frederick, SD 57441

Tall Grass Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Brookings, SD 57006

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Elkton Utility Improvements - Phase II
Infrastructure
Results
$3,516,957 est. value
Elkton, SD

Raw and Treated Water Pipelines - Phase 1
Infrastructure
Results
$2,700,000 to $3,200,000 est. value
Brookings, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

34th Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$5,040,000 CJ est. value
Tyndall, SD 57066

Concrete Repairs at the Federal Buildings
Infrastructure
Design
$100,000 CJ est. value
Aberdeen, SD 57401

Fort Thompson Dental & Optometry Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Thompson, SD 57339

Last Updated 03/10/2023 12:03 AM
Project Title

Replace Pipe and Drainage Improvements

Physical Address View project details and contacts
City, State (County) White River, SD 57579   (Mellette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $882,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US83 - 1.25 S of the S US83/SD44 Jct As of March 10, 2023, the project is in Final Planning status. Anticipated letting date is June 07, 2023. SDDOT - Replace Pipe and Drainage Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents