Similar Projects
Roeville Elevated Water Tank - City of Milton
Infrastructure
Conception
$500,000 CJ est. value
Milton, FL 32570

Highway 87 South Forcemain - City of Milton
Infrastructure
Conception
$300,000 CJ est. value
Milton, FL 32570

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Hilton Garden Inn / Pensacola
Addition, Demolition, Infrastructure - 1,800 SF
Design
$500,000 CJ est. value
Pensacola Beach, FL 32561

Bob Sikes Bridge Redundant Water Main
Infrastructure
Bidding
$3,100,000 CJ est. value
Gulf Breeze, FL 32561

Ranchettes Drainage Improvements
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Milton, FL 32571

Milton Downtown Waterfront Marina, Residential and Mixed-Use Development Opportunity
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Milton, FL 32570

RFP Engineering - Multilane Design SR 30 (US 98) in Santa Rosa County
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Gulf Breeze, FL 32563

Villa Venyce Entrance Channel Dredging
Infrastructure
Results
$782,000 CJ est. value
Milton, FL 32570

Randy Brown Road Extension
Infrastructure
Results
$5,645,335 CJ est. value
Milton, FL 32583

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bridge Repair/Rehabilitation
Infrastructure
Construction
$278,513 CJ est. value
Milton, FL 32583

Tiger Point School - Santa Rosa County School District
New Construction, Infrastructure
Pending Verification
$5,300,000 CJ est. value
Gulf Breeze, FL 32563

Oasis Resort and Escape Family Center
New Construction, Infrastructure - 30,000 SF
Pending Verification
$5,000,000 CJ est. value
Pensacola Beach, FL 32561

Locklin Lake - Upstream Stormwater Improvements - City of Milton
Infrastructure
Conception
$1,000,000 CJ est. value
Milton, FL 32570

Last Updated 07/18/2023 10:03 AM
Project Title

Tiger Point Reclamation and Waste Water Treatment Facility Expansion

Physical Address View project details and contacts
City, State (County) Gulf Breeze, FL 32563   (Santa Rosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $56,984,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. 4511-18-020 Questions regarding the project should be submitted to Megan Lewellen via email at procurement@gulfbreezefl.gov, by close of business on May 3, 2022 Each bidder's bid is to be accompanied by a bid guarantee made payable to the Owner in an amount at least equal to five percent of the bidder's maximum bid price and in the form of a certified check or bid bond. The Contractor shall furnish a combined performance and payment bond in an amount at least equal to 100 percent of the Contract Price The City of Gulf Breeze (i) will award the project to the lowest responsible and responsive bid; (ii) reserves the right to accept or reject any or all bids, to waive any bid informalities, and to readvertise for bids when deemed in the best interest of the City; and (iii) hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement,Disadvantaged Business Enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, gender, religion, age, disability, marital status or national origin in consideration for an award. Bidders shall not lobby or otherwise attempt to persuade or influence City Council members, officials, or staff, on decisions to be made relating to the bid, except in public presentations requested by the City The project consists of constructing a new headworks system, biological nutrient removal process, clarifiers, filters, chlorine contact chamber, yard piping, maintenance and administrative facility, stormwater, repurposing of several existing tankages, and all incidentals for a complete and operational system. The project budget is $32 million.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents