Similar Projects
ACU Coliseum Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure - 102,797 SF
Design
$39,000,000 CJ est. value
Abilene, TX 79699

Redbud Park - Walking Trail Replacement - City Of Abilene
Infrastructure
Design
$800,000 CJ est. value
Abilene, TX 79605

Heritage at Abilene / Abilene - Rebid
New Construction, Renovation, Infrastructure - 8,244 SF
Bidding
$4,000,000 CJ est. value
Abilene, TX 79605

Street Resurfacing Project Work Zone S11B
Infrastructure
Bidding
$200,000 CJ est. value
Abilene, TX 79601

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Shotwell Stadium Press Box
New Construction, Infrastructure
Post-Bid
$8,200,000 CJ est. value
Abilene, TX 79602

Waterline & AMR Meters
Infrastructure
Results
$15,614,000 est. value
Merkel, TX

Second Pressure Plane Supply Line - Phase 2
Infrastructure
Results
$11,000,000 est. value
Abilene, TX

Hardin-Simmons University Dormitory
New Construction, Infrastructure - 61,000 SF
Construction
$12,000,000 CJ est. value
Abilene, TX 79601

F.M. 89(Buffalo Gap Road) - Texas Department of Transportation
Infrastructure
Pending Verification
$21,650,000 CJ est. value
Abilene, TX 79606

F.M. 89(Buffalo Gap Road) - Texas Department of Transportation
Infrastructure
Pending Verification
$21,650,000 CJ est. value
Abilene, TX 79606

Nelson Park - Walking Trail Replacement - City Of Abilene
Infrastructure
Design
$600,000 CJ est. value
Abilene, TX 79602

Street Resurfacing Project WorkZones N2A and N2B
Infrastructure
Bidding
$2,000,000 CJ est. value
Abilene, TX 79601

Water Meter Tap and Set Services
Infrastructure
Post-Bid
Abilene, TX

East North 10th and South Maple Street Utility Improvements
Infrastructure
Results
$2,000,000 est. value
Abilene, TX

Last Updated 01/20/2023 10:37 AM
Project Title

Honey Bee Road Water Line Replacement

Physical Address View project details and contacts
City, State (County) Abilene, TX 79601   (Taylor County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $823,696 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 20, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Bid date: January 10, 2023 2pm. The removal and replacement of approximately 4,300 linear feet of 10" asbestos cement water line with 10" PVC water line and approximately 300 linear feet of 6" asbestos cement water line with 6" PVC water line including all valves, fire hydrants, service reconnects, water line connections, SWPPP, traffic control and incidentals. Also included is the removal and proper disposal of the existing 10" and 6"AC pipes. Completion- 110 working days

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents