Similar Projects
Construction of Large Water Meter Installation
Term Contract
Post-Bid
Chicopee, MA 01013

Furnishing and Delivery of Stainless Steel Pipes and Fittings
Post-Bid
Westfield, MA

Necessary Repairs to the Main Condenser Water Loop for Chilled Water System
Results
Less than $60,000 est. value
Springfield, MA 01103

Furnishing of Water Materials, Such as Ductile Iron Pipe, Fittings, Fire Hydrants, Valves, Service Brass and Appurtenances on an as Needed Basis
Results
Agawam, MA 01001

Water Infrastructure Improvements
Post-Bid
$1,560,000 est. value
Springfield, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Ductile Iron Pipe of Various Diameter
Post-Bid
Agawam, MA

Maple Street Water Main Improvement Project
Results
Less than $650,000 est. value
East Longmeadow, MA 01028

Telemetry Devices for Automated Meter Infrastructure
Infrastructure
Post-Bid
Agawam, MA

Water Service Boxes and Water Valve Boxes
Term Contract
Results
$62,416 est. value
Springfield, MA 01101

Phase I Water Replacement Project
Results
Less than $1,500,000 est. value
Holyoke, MA

Ohio Avenue Water Main Replacement
Results
$480,000 est. value
West Springfield, MA

Water Meters
Term Contract
Results
West Springfield, MA

Sykes Street Water Main
Results
$1,700,000 est. value
Bondsville, MA

Phase 2A Water Replacement Project
Results
$3,100,000 est. value
Holyoke, MA

Last Updated 08/20/2021 12:29 PM
Project Title

Ridge and East Circle Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) East Longmeadow, MA   (Hampden County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the installation of approximately 5050 feet of new 8" ductile iron water main, including hydrants, gate valves, water service corporations, curb stops, copper tubing and reconnections, pavement repairs and resurfacing, loam and seed, abandonment of existing water pipes and all necessary appurtenances for a complete and operational water system. All pipe and water service installation work is to be completed and accepted no later than November 30, 2021.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents