Similar Projects
WoodSprings Suites
New Construction
Conception
Warwick, RI 02886

Aloft Hotel
New Construction - 101,000 SF
Construction
$55,000,000 est. value
Providence, RI 02903

Newport North
New Construction, Demolition - 724,000 SF
Construction
$100,000,000 est. value
Newport, RI 02840

Manchester House
New Construction - 12,827 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Newport, RI

Angell Street Hotel
New Construction
Conception
Providence, RI 02906

Shephard's Run
New Construction - 3,500 SF
Design
$500,000 to $1,000,000 CJ est. value
South Kingstown, RI 02879

Waites Wharf
New Construction
Design
Newport, RI 02840

Residence Inn Providence Airport
New Construction - 100,000 SF
Construction
$25,000,000 est. value
Warwick, RI 02886

Stone House Motor Inn
Addition - 4,992 SF
Construction
$350,000 est. value
Foster, RI 02825

Downtown Inn
Renovation, Addition
Construction
$700,000 est. value
Newport, RI 02840

Central Street Hotel
Renovation - 10,000 SF
Construction
$100,000 est. value
Providence, RI 02907

Mainstay / Sleep Inn Hotel
New Construction - 15,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bristol, RI

Owners Representative Services - Tidewater Landing Project
New Construction - 300,000 SF
Results
$400,000,000 est. value
Pawtucket, RI

Owners Representative Services - Tidewater Landing Project
New Construction - 300,000 SF
Results
$400,000,000 est. value
Pawtucket, RI

Kennedy Plaza Redesign
New Construction
Conception
$140,000,000 est. value
Providence, RI 02903

Reported 09/02/2021 10:52 AM
Project Title

Tidewater Landing

Physical Address View project details and contacts
City, State (County) Pawtucket, RI 02860   (Providence County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Hotel/Motel, Stadium
Contracting Method
Project Status Construction Commenced third quarter 2021, Construction Completion Expected first quarter 2023
Bids Due View project details and contacts
Estimated Value $400,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

1 Stadium, New Construction, 1 Hotel/Motel, New Construction 200 Unit(s).
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Facility Lightning Protection, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents