Similar Projects
Roadway Reconstruction - Fleur Drive - ST267 C038EG
Infrastructure
Conception
$15,231,289 est. value
Des Moines, IA 50321

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 est. value
Des Moines, IA 50982

Wastewater Reclamation Authority (WRA) Ingersoll Run Outlet Sewer, Phase 28, Segment 1
Infrastructure
Design
$19,499,000 CJ est. value
Des Moines, IA 50309

Wastewater Reclamation Authority (WRA) Ingersoll Run Outlet Sewer, Phase 28, Segment 1
Infrastructure
Design
$19,499,000 CJ est. value
Des Moines, IA 50309

SE Des Moines Remedial Works - Pump Station Rehabilitation
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Des Moines, IA 50315

2022 Sewer Lining Program
Infrastructure
Bidding
$2,500,000 CJ est. value
Des Moines, IA 50309

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Truck Entrance Road Rehab and Replacement
Infrastructure
Post-Bid
Johnston, IA

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

McKinley Avenue Improvements - City of Des Moines
Infrastructure, Alteration
Conception
$10,234,933 est. value
Des Moines, IA 50982

Northglen Trail Replacement - City of Johnston -
Alteration
Design
$400,000 est. value
Johnston, IA 50131

Camp Dodge Truck Entrance Road Rehab and Replacement
Renovation, Infrastructure
Post-Bid
Johnston, IA 50131

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

Hickman Road/U.S. Highway 6 at 128th Street - ST18-01 - City of Urbandale
Infrastructure
Conception
$5,537,400 est. value
Urbandale, IA

Last Updated 07/28/2022 09:35 AM
Project Title

Grading - I-35

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50310   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,617,056 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 220719 G1 County: Polk Estimate - $1,500,000 - $2,000,000 Working Days : 70 Project no.: IM-035-4(317)97--13-77 ROUTE: I-35 N of NE 36th St in Ankeny to N of 315th St Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to Execute a Contract and File an Acceptable Performance Bond and Certificate of Insurance Within 30 Days of the Approval Date for Awarding the Contract Will Be Just and Sufficient Cause for the Denial of the Award and Forfeiture of the Proposal Guaranty. On Federal-aid Projects, Where Disadvantaged Business Enterprise (Dbe) Goals Have Been Established, the Bidder Is Required to Complete and Submit Form 102115 With the Bid Documents. On All Projects Without Dbe Goals, the Contractor Must Show That Affirmative Action Has Been Made to Seek Out and Consider Dbes as Potential Subcontractors. Minimum Wage Rates for All Federal-aid Projects Have Been Predetermined by the U.s. Secretary of Labor and Are Set Forth in the Specifications. However, This Does Not Apply to Projects Off the Federal-aid Highway System. All Federal-aid Projects Are Subject to the Contract Work Hours Standards Act, as Amended (Title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and Implementing Regulations. The Iowa Dot Reserves the Right to Waive Technicalities and Reject Any or All Bids. IADOT - 303 - Grading - I-35 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents