Last Updated | 02/14/2023 11:27 AM |
Project Title | Green River WWTP Replacement |
Physical Address | View project details and contacts |
City, State (County) | Green River, WY 82935 (Sweetwater County) |
Category(s) | Commercial, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Office, Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $47,825,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: 220 East Teton Blvd. Green River, WY 82935 The Contract provides for replacement of the existing treatment facility. The new facility will consist of: an administration building, a Process Building with influent screens and pumping, grit removal system, anaerobic basins, oxidation ditches, a Dewatering/UV Building with screw presses and ultraviolet disinfection, aerobic digesters, along with all concrete, equipment installation, mechanical, electrical, and instrumentation and control for a complete facility. The work also includes an effluent pipeline, upgrade of the electric service, and new gas, sewer and water service to the site. Contractors are invited to bid on a general contract for the Green River Wastewater Treatment Plant (WWTP) Replacement Project in Sweetwater County, Wyoming. The Contract provides for replacement of the existing treatment facility. The new facility will consist of: an administration building, a Process Building with influent screens and pumping, grit removal system, anaerobic basins, oxidation ditches, a Dewatering/UV Building with screw presses and ultraviolet disinfection, aerobic digesters, along with all concrete, equipment installation, mechanical, electrical, and instrumentation and control for a complete facility. The work also includes an effluent pipeline, upgrade of the electric service, and new gas, sewer and water service to the site . All bids shall be accompanied by a Bid Bond in the amount of five (5) percent of the amount of bid. No checks will be accepted. Bid Bond must be issued in the name of the bidder. Successful bidder shall be required to provide Performance and Payment Bonds each in the total amount of the bid. NO BID WILL BE CONSIDERED IF NOT ACCOMPANIED BY SUCH BID BOND. The Work shall be Substantially Completed on or before 608 (Six Hundred Eight) consecutive calendar days after the specified start date as identified in the NOTICE TO PROCEED, and completed and ready for final payment in accordance with the GENERAL CONDITIONS on or before 730 (Seven Hundred Thirty) days after NOTICE TO PROCEED. The Owner reserves the right to reject any or all Bids and to waive irregularities therein, and all Bidders shall agree that such rejection shall be without liability on the part of the Owner for any damage or claim brought by any Bidder because of such rejections, nor shall the Bidders seek any recourse of any kind against the Owner because of such rejections. The filing of any Bid in response to this Notice and Call for Bid shall constitute an agreement of the Bidder to these conditions. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |