Similar Projects
Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Agricultural Well Repair Services
Infrastructure
Bidding
Chowchilla, CA

Washington Well Improvements: Well Drilling (Phase I)
Infrastructure
Bidding
$3,340,000 est. value
Santa Ana, CA 92701

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

On-Call Construction Services for Wells/Pumps Repair and Rehabilitation
Infrastructure
Bidding
Long Beach, CA

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Groundwater Monitoring Well Installation and Initial Reporting
Infrastructure
Bidding
$200,000 est. value
San Rafael, CA

Install Chill Water Pumps
Term Contract
Post-Bid
CA 95652

Drilling of Water Wells North Long Beach 13 and North Long Beach 14
Infrastructure
Results
$4,486,918 est. value
Long Beach, CA 90899

Contractor - On Call Pump Repair
Infrastructure
Bidding
Culver City, CA

Reported 06/17/2022 09:41 AM
Project Title

Chico Municipal Airport Groundwater Remediation - 45052 - City of Chico

Physical Address View project details and contacts
City, State (County) Chico, CA 95973   (Butte County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $501,022
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of pump and treatment well and monitoring wells to treat groundwater contamination at Chico Municipal Airport (CMA) The project is included in the City of Chico's FY 2021-2032 Capital Improvement Program (CIP). As of June 16, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in 2022.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents