Similar Projects
Davis Road Widening - WT26029 - City of Stockton
Infrastructure
Conception
$4,371,000 est. value
Stockton, CA 95214

Pershing Avenue Roadway Crown Reduction - WT26036 - City of Stockton
Infrastructure
Conception
$2,000,000 est. value
Stockton, CA 95214

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Operational Improvements
Infrastructure
Design
$17,836,000 est. value
Stockton, CA 95214

A Street South, Area 1 and 2 (topside) Phase 2
Infrastructure
Bidding
$300,000 est. value
Lathrop, CA 95330

COS MUD RWCF Bioscrubber Repairs
Infrastructure
Bidding
$650,000 est. value
CA 95206

A and E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid
$6,425,530 to $10,441,487 est. value

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Brennan Avenue Resurfacing
Infrastructure
Results
$1,140,000 to $1,395,000 est. value
Escalon, CA

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

West Lane Bridge Slope Repair - City of Stockton
Alteration
Conception
$480,000 est. value
Stockton, CA 95214

Well Site No. 1A Improvement Project
Infrastructure
Bidding
$300,000 est. value
Escalon, CA 95320

Levee Rehabilitation Project
Infrastructure
Post-Bid
$370,000 est. value
Stockton, CA

Road Diet On North Eldorado Street, Turn And Bike Lanes
Infrastructure
Results
Stockton, CA 95214

Downtown East-west Connection - WT22050 - City of Stockton
Infrastructure
Conception
$1,689,000 est. value
Stockton, CA

Last Updated 07/19/2022 08:19 AM
Project Title

Aurora Street Over Mormon Slough Bridge - WT22035 - City of Stockton

Physical Address View project details and contacts
City, State (County) Stockton, CA 95202   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $347,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will repair structural damages on Aurora Street over Mormon Slough including fire and slope damages caused by homeless encampments. This project is in included in the City of Stockton FY 2022-2027 Capital Improvement Plan (CIP). As of July 18, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents