Similar Projects
Collection System Extension Nw Hickory
Bidding
Hickory, NC

Creative Services for Storm Water
Term Contract
Bidding
Charlotte, NC

Maple Street/Merritt Street Water Improvements Project
Post-Bid
Mount Airy, NC 27030

South Main Street and Southern Avenue Stormwater Improvements
Post-Bid
$893,000 est. value
Raeford, NC 28361

Bethel Drive Trenchless Pipe Repair
Results
Salisbury, NC 28144

Storm Drainage Improvements
Results
Greensboro, NC 27401

2021 Disaster Response Emergency Construction Services
Term Contract
Bidding
Less than $500,000 est. value
Jacksonville, NC

High School Storm water Improvement Project
Post-Bid
Charlotte, NC 28208

Stormwater Replacement Project at 422 Carolina Avenue
Results
Shelby, NC 28151

On-Call Stormwater Control Measure Repair Services
Bidding

Rempac Flood Mitigation
Post-Bid
Lumberton, NC 28358

2020 Stormwater Infrastructure Repairs
Results
Less than $321,583 est. value
Durham, NC

Repair Culvert Cross Street (20-0017)
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

Storm Water Repair and Improvement FY2020 C
Results
Less than $4,234,000 est. value
Charlotte, NC

System A Storm Drain Improvements Project
Post-Bid
Harrisburg, NC 28075

Last Updated 11/06/2019 04:05 PM
Project Title

Stanton Drive Stormwater Replacement

Physical Address View project details and contacts
City, State (County) Shelby, NC 28151   (Cleveland County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove approximately 30 linear feet of existing 15" RCP pipe and replace with 15" double wall HDPE pipe in the road. The new pipe shall be bedded with wash stone. The original brick boxes will remain and will need to be patched around the new pipe. 2. Remove approximately 40 linear feet of existing 15" RCP and replace with City supplied 16" DIP. The new pipe shall be bedded with wash stone. There are no headwalls associated with this pipe. 3. The street cut shall be backfilled with at least 8” of ABC stone and 4" of asphalt. All edges shall be clean cut with a saw. 4. Contractor will be responsible for cleaning up and disposing of all construction materials from the project site upon completion of the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents