Similar Projects
Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Seal Coat Aggregate
Infrastructure
Bidding
$40,000 CJ est. value
Mascoutah, IL 62258

Seal Coat Aggregate
Infrastructure
Bidding
$40,000 CJ est. value
Mascoutah, IL 62258

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Winstanley Park (Sinai Village Phase III)
New Construction, Renovation, Infrastructure - 44,122 SF
Post-Bid
$9,000,000 CJ est. value
East Saint Louis, IL 62201

4th Street Reconstruction
Infrastructure
Results
$1,663,811 est. value
Belleville, IL

Repair Asphalt Roads and Parking Scott AFB
Alteration
Results
$500,000 to $1,000,000 est. value
Scott Air Force Base, IL

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

Hampton Manor of St. Clair County
New Construction, Infrastructure - 66,481 SF
Design
$18,000,000 CJ est. value
O Fallon, IL 62269

MMB Property Clearing and Restoration
Alteration
Post-Bid
Belleville, IL

Pavement Widening, HMA and PCC Pavement, Storm Sewer, Curb and Gutter, Replace the Deck on the Structure over the Tributary to Richland Creek, Pipe Culverts, Guardrail, Pavement Markings, and Traffic Signal Improvements on Frank Scott Parkway from West of Old Collinsville Road to West of Green Mount Road
Infrastructure
Results
IL

Last Updated 07/07/2023 11:17 AM
Project Title

538 N. 33rd Street Inlet Removal and Replacement

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL 62205   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of East St. Louis shall not be responsible for the premature opening of a Bid, which is not properly addressed or identified. Late Bids will not be considered. All Bids shall become the property of the City. The successful bidder on all construction and capital improvement projects in excess of $10,000, shall furnish a Performance Bond equal to one hundred (100%) percent of the total Bid. The City of East St. Louis reserves the right to negotiate with the selected bidder the exact terms and conditions of the contract. Question Deadline 07/05/2023 Questions regarding this Request for Bid should be directed to Tim Lockett, Public Works Director at 618-482-6737.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents