Similar Projects
Lakeview Pumping Station - Electrical and Control Improvements - 39131 - City of Chicago
Renovation
Conception
$2,372,566 est. value
Chicago, IL 60640

Cermak Pumping Station - Electrical Improvements - 3301 - City of Chicago
Renovation
Conception
$23,345,708 CJ est. value
Chicago, IL 60607

Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Pump Replacements at Chain of Rocks Pump Station - Rivers Project Office - St. Louis District
Renovation
Bidding
$5,000,000 CJ est. value
Granite City, IL 62040

Repair and Replace Water Supply System Rebid
Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Monee, IL 60449

RAS Pump Station Valve Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Decatur, IL 62522

Main Pump Station - Pump No. 4 Replacement
Renovation
Sub-Bidding
$520,000 CJ est. value
Aurora, IL 60505

York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Post-Bid
Bensenville, IL 60106

Main Street and Organ Street Pumping Station Rehabilitations
Renovation
Post-Bid
Eldorado, IL

Lakeshore Drive Lift Station Replacement
Results
Decatur, IL 62521

Dawes Elementary Vacuum Pump Station
Renovation
Results
Chicago, IL 60652

Kimundy Pump Station - Contract B
New Construction - 23,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Sandoval, IL 62882

Pump House Improvements - Village of Lincolnwood
Renovation, Infrastructure
Conception
$365,700 CJ est. value
Lincolnwood, IL 60712

Lift Station Rehabilitation - Bode Road - Village of Schaumburg
New Construction
Design
$350,000 est. value
Schaumburg, IL 60194

Last Updated 08/04/2022 03:33 PM
Project Title

Lift Station Rehabilitation PY21, (Pocket Road and Missouri Avenue)

Physical Address View project details and contacts
City, State (County) Alorton, IL 62207   (Saint Clair County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $98,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 20, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** All work shall be constructed under the provisions of the Standard Specifications for Road and Bridges Construction prepared by the Department of Transportation of the State of Illinois, adopted January 1, 2022 and the Standard Specifications for Water and Sewer Main Construction in Illinois, July 2009, Sixth Edition. The only exception to these standards, are all references to measurement and payment. Bidder's must also complete forms marked with an *. Bidder's subcontractor must provide information for the forms marked with two ** All documents must be submitted with the Bid. The project consists of removal and replacement of lift station pumps, control panel, valves, flow meter, pressure gauge, guide bars, float switches, lift cables, power pole, disconnect switches, power and alarm cables, discharge pipe, and wetwell lid and access hatch at the Pocket Road and Missouri Avenue lift station. Bidders are required to comply with the President's Executive Order No. 11246 as amended. Awarded contract will be federally funded in part with a grant by HUD. Not less than (15%) of the total contract amount must be expended with a Minority Business Enterprise. Contact the St. Clair County IGD, (618.825.3211) for questions on MBE participation.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents