Last Updated 02/04/2019 10:22 AM
Project Title

Community Transportation Fund, North II, 2019 Pilot

Physical Address View project details and contacts
City, State (County) DE   (New Castle County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,947,025
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1.00 Ls Clearing And Grubbing 6,826.65 Sy Removal Of Pcc Pvmt, Curb And Sidewalk 1,065.70 Cy Graded Aggregate Base Course, Type b 229.85 Cy Graded Aggr Base Course, Ty b, Patching 8,701.00 Ton Superpave Type c, Pg 64-22 (Cbstone) 352.25 Ton Superpave Type Bcbc, Pg 64-22 620.45 Ton Superpave Type c, Pg 64-22, Patching 282.00 Lf Speed Hump 10,834.30 Syin Bituminous Concrete Patching 216.00 Sy Pcc Pavement, 8" 17.00 Each Replace Drainage Inlet Grate(s) 46.00 Eachadjust And Repair Exist Drainage Inlet 65.00 Eachadjust And Repair Exist Manhole 290.00 Lf Pcc Curb, Type 2 6,715.00 Lf Ipcc Curb And Gutter, Type 1-8 7,990.00 Lf Ipcc Curb And Gutter, Type 2 5,475.10 Sf Pcc Sidewalk, 4" 4,842.45 Sfpcc Sidewalk, 6" 730.00 Sf Sidewalk Surface Detectable Warning Syst 14,600.00 Sfcurb Ramp, Type 2, 3 And/Or 4 1.00 Each Relocate Monument 1.00 Each Adjust Water Valve Boxes 137,500.00 Syin Pavement Milling, Bituminous Conc Pavt 385.00 Syin Pavement Milling, Bituminous Conc, Taper 56,886.50 Lf Saw Cutting, Bituminous Concrete 6,628.67 Lfsaw Cutting, Concrete, Full Depth 1.00 Ls Initial Expense/De-Mobilization 1.00 Ls Maintenance Of Traffic, All Inclusive 26.00 Eady Arrow Panels Type c 26.00 Eady Furn And Maint Truck Mount Att, Type Ii 8,343.36 Hour Flagger, New Castle County, State 801.08 Hour Flagger, New Castle County, State, Ot 1,022.00 Sf Perm Pave Striping, Sym/Leg Alk-Thermo 1,820.00 Lf Temporary Markings, Paint, 4" 1,820.00 Lf Perm Pave Striping, Epoxy Wht/Ylw, 5" 115.00 Lf Furn & Inst Loop Wire 1-Con #14 Awg 1/4" 985.75 Ton Topsoil 2,503.25 Sy Permanent Grass Seeding, Subdivision 2,449.25 Sy Erosion Control Blanket Mulch
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents