Similar Projects
Mesa High School Elevator Modernization
Renovation
Bidding
Mesa, AZ 85204

Job Order Contracting
Renovation
Bidding
Tempe, AZ

Paradise Honors Classroom Building
New Construction
Post-Bid
Surprise, AZ 85388

Tempe Academy Campus Rebuild - GMP2
New Construction, Renovation, Demolition - 55,451 SF
Post-Bid
$10,500,000 est. value
Tempe, AZ 85282

Weatherization Project at Highland High School
Results
Less than $441,604 est. value
Gilbert, AZ 85296

Build a New High School #7
New Construction
Results
Less than $22,124,889 est. value
Chandler, AZ

Restroom Renovations at North High School
Renovation
Construction
Less than $1,085,889 est. value
Phoenix, AZ 85014

Greenhouse Montessori - Classroom Building
New Construction - 3,870 SF
Construction
$500,000 est. value
Gilbert, AZ 85296

Mountain View Elevator Modernization
Renovation
Post-Bid
Mesa, AZ 85213

Job Order Contracting for General Contractors
Results
AZ

Building Weatherization at Westwood High School
Post-Bid
Mesa, AZ 85201

A New High School
New Construction
Results
$22,500,000 est. value
Maricopa, AZ 85138

CMAR Gililland Middle School
Renovation
Post-Bid
$38,000,000 est. value
Tempe, AZ 85281

Classroom Building Additions at Tonopah Valley High School
Addition - 15,000 SF
Results
$4,800,000 est. value
Tonopah, AZ 85354

Demo Media Center and New Performing Arts Center, New Media Center, 500 Building Demo and Rebuild
Renovation, Demolition
Post-Bid
$36,500,000 est. value
Tolleson, AZ 85353

Last Updated 06/19/2020 01:54 PM
Project Title

NCHS Performing Art Center Renovations and Improvements

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85024   (Maricopa County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $8,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work closely with the project architect, and District personnel for design support and possible construction of an energy efficient and environmentally friendly performing arts center at North Canyon High School. The following scope of work for this project is subject to change: The District intends to renovate the existing 1,250 seat Performing Arts Center at North Canyon High School. The building renovations will be implemented in two (2) separate phases. Phase 1 - Renovation to the “back of house” classrooms, restrooms, dressing rooms, corridors, and support spaces. Renovations will include replacement of existing carpeting, removal of VCT in corridor and replace in polish concrete, replacement of all fluorescent lights with LED lighting, interior painting, complete renovations of restrooms including dressing rooms, replacement of ceiling tile, and miscellaneous plumbing, electrical upgrades. Total square footage is approximately 19,300 sqft. – Substantial Completion Date : July 21, 2020. Phase 2 - Renovation o f stage, house, lobby, public restrooms, ticket booth, and minor exterior upgrades. Renovations to include new rigging, replace all existing lighting with LED, new auditorium seating, new wall finishes and acoustical treatments, new sound system, replacement of folding acoustical wall panels, complete lobby upgrades including restrooms. Total square footage is approximately 32,800 sqft. – Substantial Completion Date : May 11, 2021.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents