Similar Projects
RIC Casework/Millwork/Veneer Work
Post-Bid
Richmond, VA 23250

Y--Paint Interior/Exterior Various Buildings Hampton VA Medical Center Hampton VA Total SDVOSB Set-Aside
Post-Bid
$500,000 to $1,000,000 est. value
Hampton, VA

Sound Absorption
Results
Herndon, VA

Alleghany High School New Tech
Results
Alleghany, Low Moor, VA 24426

Precast and Glazing Package
Post-Bid
Richmond, VA

Fire Restoration Services - Creighton
Results
Richmond, VA

EMC Project Part 2
Post-Bid
Alexandria, VA

7th and Marshall Street Parking Deck Stair - Elevator Tower Repairs
Results
Richmond, VA 23219

Installation of Wallcoverings
Post-Bid
Roanoke, VA 24016

CC Classroom Acoustical Ceiling
Results
Annandale, VA 22003

Battleship Wisconsin Interior Renovations
Post-Bid
Norfolk, VA 23510

Sheetrock Replacement and Painting, Multiple Rooms
Results
Fishersville, VA

Community Corrections Center Counter Tops
Post-Bid
Winchester, VA

Furnish and Install Suspended Acoustic Ceiling Tiles
Term Contract
Results
Hampton, VA

Pipe and Drapes
Post-Bid
Roanoke, VA 24011

Reported 02/27/2019 12:00 AM
Project Title

Z--658-14-117 Replace Finishes Various Buildings (Va-19-00017617)

Physical Address View project details and contacts
City, State (County) Salem, VA 241536404   (Salem City County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The intent of this project is to provide demolition of existing ACM mastic in building 2A and replace with new basement flooring, walls, wall protection and handrails. Work will initiate with abatement of certain hazardous materials including asbestos-containing materials (ACM) in floor tile and wall ceramic tile mastic in bldg. 2A basement and a section of 2A first floor corridor. Contractor shall demo all remaining existing quarry tile flooring in connecting corridors in the west loop (in proximity to buildings 76 and 77) and replace floors with new epoxy urethane floor surface. Contractor shall demo basement hallway quarry tile floors in buildings 12, 76 and 77 and replace floors with new epoxy urethane floor surface. The work shall be conducted with the buildings occupied, so the work must provide for appropriate environmental control measures to ensure that the building and any other structures dependent on utilities emanating from these buildings are adequately heated and cooled during the construction process. Contractor shall also provide new stair vinyl stair treads and nosing in each stair well located in bldg. 143. Work includes all labor, material, equipment and supervision to perform the required construction work on this project.
Details
Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes, Flooring, Resilient Flooring, Resilient Sheet Flooring, Vinyl Sheet Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents