Similar Projects
Construction Services for Jetty and Wing Wall Repairs In Kennebunk and Kennebunkport, Maine
Design
$1,000,000 to $5,000,000 est. value
Kennebunk, Kennebunkport, ME

Approximately 5,280 Feet of Ditching and Replacing Culverts
Infrastructure
Bidding
Patten, ME

Culvert Replacement/Located on Route 133
Infrastructure
Bidding
Jay, ME

Culvert Pipe
Post-Bid
Portland, ME

Ditching and Culvert Work
Post-Bid
Princeton, ME

Senott Road Culvert Replacement
Results
Whitefield, ME

Adams Street Ditching and Culvert Replacement
Results
Farmingdale, ME

Sly Brook Road Ditching and Road Upgrade
Infrastructure
Bidding
Eagle Lake, ME 04739

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

West Street Culvert Replacement
Results
Freeport, ME 04032

2019 Grants for Stream Crossing Public Infrastructure Improvements
Post-Bid
Less than $125,000 est. value
Augusta, ME

Loon Lake Road Rangeley
Results
Rangeley, ME

Elm Street Culvert Replacement
Post-Bid
Topsham, ME 04086

Culvert Replacement/Located on Route 218
Results
Alna, ME 04535

Corrugated Exterior/Smooth Interior Hdpe Culvert Pipe
Infrastructure
Post-Bid
Turner, ME

Last Updated 08/10/2021 10:18 AM
Project Title

Captain Thomas Road Culverts Replacement

Physical Address View project details and contacts
City, State (County) Ogunquit, ME 03907   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000 to $325,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing two existing culverts at two separate locations on Captain Thomas Road both crossing the Ogunquit River in Ogunquit, ME. The first crossing is located approximately 150ft east of the intersection of Autumn River Lane and will include replacement of the existing 48” Corrugated Metal Pipe (CMP) with new precast culvert elements (40’ long precast concrete box culvert, precast block wingwalls, and precast concrete cutoff wall units). The second location is approximately 400ft east of the first crossing and includes replacing the existing 24” CMP with a single 48” HDPE pipe with precast concrete headwalls. The work shall also include pedestrian detour, traffic maintenance, guardrail installation, riprap installation, and earthwork.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents