Similar Projects
LC 309 311 Remodel
Bidding
$140,000 est. value
Orem, UT 84058

LC 309 311 Remodel
Bidding
$140,000 est. value
Orem, UT 84058

Canopies for Weber County Fair
Post-Bid
UT 84401

SLCC Interior Sign Replacement
Post-Bid
Less than $69,000 est. value
Salt Lake City, UT

Room Partition Walls
Term Contract
Results
Less than $50,000 est. value
Salt Lake City, UT 84112

High School Stage Rigging Systems Replacement
Term Contract
Results
Clearfield, UT 84016

Davis School District High School Stage Rigging Systems Replacement
Construction
Layton, UT 84041

Davis School District High School Stage Rigging Systems Replacement
Construction
Layton, UT 84041

Capitol Aerial Suspension System - Phase I and II
Bidding
Salt Lake City, UT 84111

Childrens Justice Center Tile Facade Repair
Post-Bid
Farmington, UT 84025

U Hospital Interior Signage - Phase 2
Results
Less than $1,200,000 est. value
Salt Lake City, UT

Fabrication of Metal Stairs and ADA Ramp for Sand Flats Modular Office Building Access
Post-Bid
Moab, UT 84532

Locker Replacement for Centerville and Mueller Park Jr. High Schools
Results
Bountiful, Centerville, UT 84010

Crossville Studios Tile or Equal
Post-Bid
Clearfield, UT 84016

DFCM Construction - Pre Qualified General - Utah Fine Arts Council Remodel - 20251080
Results
Less than $129,140 est. value
Salt Lake City, UT 84102

Last Updated 03/30/2020 10:32 AM
Project Title

Lehi Junior High School Operable Partition Replacement

Physical Address View project details and contacts
City, State (County) Lehi, UT 84043   (Utah County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Removal and disposal of existing operable wall system. 2. Provision and installation of a new electrically operated Acoustiseal 933E panel partition by Modernfold or prior approved equal. Product substitution requests must be submitted by Wednesday, March 4th with side-by-side support documentation and references showing equal or better than specified product. The District will then review and either approve or disapprove the product based on the information submitted. 3. Dimension size: 103’-4” X 22’-0". 4. Finish to be standard carpet. Color to be selected by District from standard colors. 5. Steel track and trolley system. 6. STC of 28. 7. Include pass door as a line item alternate price.

Details

Division 08 - Openings, Louvers, Operable Wall Louvers.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents