Similar Projects
Intersection Improvements
Infrastructure
Bidding
Biddeford, ME 04005

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Westside Village Reconstruction Project
Post-Bid
Sanford, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Alfred, Arundel, Biddeford, Lyman, ME 04002

Demolition and Removal of the 46 High Street Building
Demolition
Results
Sanford, ME 04073

Westpoint Stevens Boiler House
Demolition
Construction
Biddeford, ME

Demolition of a Foundation Structure and Cleanup of Certain Debris and Refuse
Demolition, Infrastructure
Post-Bid
Hollis, ME 04042

Demolition and Removal of the 8 Perkin's Court Building
Demolition
Results
Sanford, ME 04073

2021 Road Pavement Work
Infrastructure
Post-Bid
Wells, ME

Pavement Milling and Cyclical Pavement Resurfacing
Results
Kennebunk, ME 04043

Pavement Milling and Cyclical Pavement Resurfacing
Results
Limerick, ME 04048

(LCP) Light Capital Paving
Results
Berwick, Cornish, Hollis, Limerick, Newfield, North Berwick, Parsonfield, Shapleigh, ME

On Call Maintenance Paving/Located in Regions 1-5
Results

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,062,000 est. value
Biddeford, Saco, ME 04072

Highway Safety Improvements
Results
Sanford, ME 04073

Last Updated 07/21/2021 09:20 AM
Project Title

York Toll Plaza Demolition and Mainline Reconstruction, Mile 7.3

Physical Address View project details and contacts
City, State (County) York, ME   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of highway and site work required to demolish the existing toll plaza and reconstruct to a highway. The work at Mile 7.3 consists of demolition of the existing 17-lane toll plaza, tunnel, removal of existing utilities, and reconstruction of the existing plaza to a three (3) lane highway southbound and a four (4) lane highway northbound. The work includes earthwork, pavement, concrete, toll plaza and tunnel demolition, signing, overhead sign structures, concrete barrier, guardrail, electrical work, and lighting. The work also includes maintenance of traffic and all other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents