Similar Projects
Reported | 08/09/2019 12:00 AM |
Project Title | Campus Exterior Signage 2019 |
Physical Address | View project details and contacts |
City, State (County) | University Center, MI (Bay County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. The Sign Contractor shall furnish all labor, services, materials, equipment necessary to fabricate and install new signs per Design Intent Drawings; field verify dimensions and site conditions at sign locations; engineer signs and provide fastenings for attachment, installation and adjustment of sign units into final locations. Sign Contractor shall obtain any necessary permits. B. The Sign Contractor shall remove all existing installed signs in conflict with new work. C. The Sign Contractor shall remove and re-install existing letters on buildings as noted. D. Concrete and sign bases, with cast in place anchor bolts or other reinforcement structure for Building ID and Directional signs shall be provided by sign supplier using a Concrete Contractor from Owner’s list of approved contractors. E. The Sign Contractor shall coordinate with Owner and other trades as required for completing the Work. F. Installation of all work shall be completed according to deadlines determined by Owner. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |