Similar Projects
Outdoor Pickleball and Sports Courts
Infrastructure
Bidding
$220,000 CJ est. value
Perryville, MO 63775

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Pavement Improvements and Culvert Replacement
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Design Build Services Perry County Joint Justice Center
New Construction, Infrastructure
Construction
$150,000 CJ est. value
Perryville, MO 63775

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

Perry County Admin Building Parking Lot Annex
Infrastructure
Post-Bid
$500,000 est. value
Perryville, MO

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Tornado Siren Installation
Infrastructure
Post-Bid
$160,000 CJ est. value
Perryville, MO 63775

Route 51 - Grading and Pavement from Old St Mary's Road to Route T in Perryville
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

Bridge Rehabilitation
Renovation
Results
$7,500,000 to $10,000,000 est. value
Perryville, MO 63747

Concrete the Floor and Drive Through Area of the Existing Building at the Perry County Solid Waste Department
Infrastructure, Renovation
Results
$500,000 CJ est. value
Perryville, MO 63775

Perry County Road 322 Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$463,524 CJ est. value
Perryville, MO 63775

Last Updated 03/30/2023 04:45 PM
Project Title

RFQ D/B - Chester Bridge - Missouri Department of Transportation (MoDOT)

Physical Address View project details and contacts
City, State (County) Perryville, MO 63775   (Perry County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $208,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The owner has selected a Design Builder https://www.ksdk.com/article/news/local/modot-team-replace-chester-bridge/63-8c6c1501-ebc4-4d0d-9e6a-f1be0699ffca - The Missouri Department of Transportation's commission has selected a design-build contractor to replace the Chester Bridge. A proposal from The Ames Team, comprised of Ames Construction Inc. and Parsons Transportation Group, was selected by the Missouri Highways and Transportation Commission. The bridge was originally constructed in 1942. It spans across the Mississippi River, connecting the cities of Perryville, Missouri, and Chester, Illinois, via Route 51. According to MoDOT, around 7,000 vehicles use the bridge daily. The bridge is safe for travel, but the aging structure is considered in poor condition, according to MoDOT. The commission approved an amendment on Sept. 9, 2021, to fund the Chester Bridge Replacement Project. "This major river bridge is vital to agricultural traffic, area industries and travelers," said Missouri Department of Transportation Project Director Brian Okenfuss. "While the current bridge is safe, it is in poor condition. The new Chester Bridge will reduce the number of flood-related closures and better serve today's traffic." The Ames Team will construct the bridge upstream from the existing structure, making it twice as wide. No long-term lane closures are anticipated by MoDOT and traffic will continue as construction is completed. The completion date is by the end of 2026 and will cost approximately $284 million, according to a press release. Find more information and renderings on the Chester Bridge replacement here.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents