Similar Projects
3900 Alton
New Construction, Build-Out - 197,780 SF
Conception
$10,000,000 CJ est. value
Miami Beach, FL 33140

Brickell World Plaza - Phase 2b & 2c
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

One Brickell City Centre
New Construction - 743,768 SF
Design
$1,000,000,000 est. value
Miami, FL

7918 West Drive
New Construction - 99,078 SF
Design
$5,000,000 to $10,000,000 CJ est. value
North Bay Village, FL

The Kavista
New Construction - 201,283 SF
Bidding
$10,000,000 CJ est. value
Miami, FL 33138

Doral City Place
New Construction
Bidding
Doral, FL 33166

PHCD Vacant Unit Preparations
Post-Bid
$1,800,000 est. value
FL

PHCD Work-Order Contract 2021 - Central Area
Post-Bid
$2,175,000 est. value
Miami, FL 33125

Neptune Apartments Exterior Rehabilitation
Results
Less than $550,000 est. value
Miami Beach, FL 33139

Work Order Contract 2020- Central Area
Results
Less than $2,500,000 est. value
Miami, FL

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Markers Grove Isle
New Construction, Renovation - 126,350 SF
Construction
$10,000,000 est. value
Coconut Grove, FL

Kendall Town Center
New Construction - 1,174,730 SF
Conception
Miami, FL

Publix #58 and Miracle Residences
New Construction, Demolition - 433,288 SF
Design
$81,500,000 est. value
Coral Gables, FL

Prequalification for the NMCRA Residential Rehabilitation Construction Program
Renovation
Post-Bid
North Miami, FL

Last Updated 09/08/2021 07:40 AM
Project Title

The Line

Physical Address View project details and contacts
City, State (County) Kendall, FL 33156   (Miami-Dade County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Project Delayed, Tenant Negotiations
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, 22 Stories Above Grade, New Construction, 449 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents