Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Installation of Pipe and Duct Insulation
Post-Bid
Taylors, SC

Greenville - Building 112 Chiller Addition
Results
$280,000 to $330,000 est. value
Greenville, SC 29607

SFMS HVAC Project
Results
Less than $1,699,881 est. value
Fort Mill, SC 29715

Heating, Ventilation, and Air Conditioning (HVAC) Project for East North Street Academy
Post-Bid
Greenville, SC 29607

Partial HVAC Replacement Project at Greer High School
Results
Greer, SC 29651

Covid-19 HVAC Equipment Servicing
Post-Bid
Fort Mill, SC

HVAC Maintenance Platforms - Three Schools
Results
Greenville, Simpsonville, SC 29615

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

SCDMH Piedmont and Greer HVAC Maintenance
Term Contract
Results
Simpsonville, SC 29681

Water Cooled HVAC Chiller - Bon Secours Wellness Arena
Term Contract
Post-Bid
Greenville, SC 29601

Installation of HVAC Boiler/Heating Water System - Eastside High School
Alteration
Results
Taylors, SC 29687

Air Conditioning Contractor Services - Indefinite Delivery Contract (IDC)
Term Contract
Post-Bid
SC

Air Conditioning Service for Activity Buses
Term Contract
Results
Taylors, SC

Heating Contractor Services
Alteration
Post-Bid
Taylors, SC

Last Updated 06/15/2022 02:20 AM
Project Title

Paris Elementary School - Replacement of HVAC Roof Top Units, Vavs and Boilers

Physical Address View project details and contacts
City, State (County) Taylors, SC 29687   (Greenville County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall be performed in accordance with the terms and conditions of this solicitation. The Scope of Work consists, in summary, of: 1. Replace 10 RTUs and 79 VAVs provided by SDGC. 2. Install Piping Packages provided by SDGC. 3. Replace dielectric unions. 4. Provide and install DOAS units (phase 2). 5. Coordinate with Trane Controls installation provided by SDGC.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents