Similar Projects
Water Treatment Plant Rehabilation
Renovation
Bidding
Marshallville, GA

Construction of Joiner Road Water Treatment Plant - New Treatment Facility Well No. 4
New Construction
Bidding
Tennille, GA 31089

Hightower Water Treatment Plant Expansion
Renovation
Post-Bid
Dawsonville, GA

Shoal Creek Wastewater Treatment Plant Central
Post-Bid
Griffin, GA

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

Water Treatment Plant Improvements
Renovation
Bidding
Lincolnton, GA

Water Treatment Plant Expansion Membrane Procurement
New Construction
Post-Bid
GA

Water Treatment Plant #1 Aerator Replacement
Results
Kingsland, GA 31548

Fowler Water Reclamation Facility Phase II Expansion
Addition
Bidding
$150,000 est. value
Cumming, GA 30040

Riverside Drive WTP FY2022 Basin Coatings Project
Renovation
Post-Bid
Gainesville, GA 30501

Canton Wastewater Treatment Plant Expansion to 6-MGD
Results
$63,789,100 est. value
Marietta, GA 30066

Contractor - Water Treatment Plant Holding Pond Dam
New Construction
Bidding
$500,000 est. value
Carrollton, GA

AWTP Chlorine Scrubber System
Renovation
Post-Bid
Macon, GA 31211

Management, Operations, and Maintenance of the Water and Wastewater Treatment Facilities
Results
Saint Marys, GA

Reported 04/28/2022 12:00 AM
Project Title

Construction of the Rocky Creek WWTP Final Clarifier #5 Project

Physical Address View project details and contacts
City, State (County) Macon, GA 31208   (Bibb County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor, materials, tools, equipment, and incidentals and performing all operations in connection to removing and replacing the Rocky Creek WWTP Final Clarifier #5 in accordance with the specifications and subject to the terms and conditions of the contract. The work will consist of making the necessary field modifications and supplying all appurtenances to ensure proper installation as per Macon Water Authority (MWA) specifications

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents