Similar Projects
Last Updated | 07/22/2022 07:07 AM |
Project Title | Open End, Structure Maintenance, North District, FY22-24 |
Physical Address | View project details and contacts |
City, State (County) | Middletown, DE 19709 (New Castle County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,804,550 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The improvements consist of furnishing all labor and materials to initiate repairs and preventative maintenance to bridges and culverts in DelDOT North District which includes bridges on I 95/I 295/I 495. Work shall include but not be limited to crack sealing decks, warm mix repairs, coating parapets and sidewalks, expansion joint replacement, riprap placement, and concrete repair. Some work may be in the channel including but not limited to placing riprap, installing sandbag dike diversions, and channel excavation. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. LOCATION: New Castle County These improvements are more specifically shown on the Location Map(s) of the attached Plans. PRE-BID MEETING: No All work on this contract must be complete within 1,095 Calendar Days. The Contract Time includes an allowance for 0 Weather Days. The Department's intent is to issue a Notice to Proceed for work to start on or about October 3, 2022. Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Questions and responses are posted at bids.delaware.gov, and bidx.com/de/. The date of the final posted Questions and Answers document must be entered on the submitted Certification Form. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. 29 Del.C. 6962 (c)(12)(a) requires DelDOT to include a performance-based rating system for contractors. The Performance Rating for each Contractor shall be used as a prequalification to bid at the time of bid. Refer to 'General Notices' for details. DEDOT - Open End, Structure Maintenance, North District, FY22-24 |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |