Similar Projects
Bonnyview Apartment
New Construction - 298,975 SF
Conception
$10,000,000 CJ est. value
Murray, UT 84107

The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

South Cairns Development
New Construction
Design
Sandy, UT 84070

The Richmond Flats
New Construction - 1,700 SF
Sub-Bidding
$9,730,000 est. value
Salt Lake City, UT 84106

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

The Zephyr
New Construction - 99,892 SF
Post-Bid
$6,827,300 est. value
Salt Lake City, UT 84101

DFCM Construction - VBS CX Services - UU West Village Family and Graduate Housing
New Construction, Alteration - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT

Upper West Apartments
New Construction - 315,535 SF
Construction
West Jordan, UT 84088

Block 67
New Construction - 430,000 SF
Construction
$5,454,500 est. value
Salt Lake City, UT 84111

Granary on 9th
New Construction - 187,020 SF
Pending Verification
$5,200,000 est. value
Salt Lake City, UT

Sugar House Apartments
New Construction
Pending Verification
Salt Lake City, UT

Sage Valley Apartments Phase 2
New Construction
Conception
West Valley City, UT

South Highland Mixed Use
New Construction - 166,481 SF
Design
$10,000,000 CJ est. value
Millcreek, UT

Salt Lake Crossing
New Construction - 306,775 SF
Post-Bid
$12,000,000 to $13,000,000 est. value
Salt Lake City, UT

Last Updated 09/15/2021 11:41 AM
Project Title

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84108   (Salt Lake County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums, Dormitory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $109,525,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This design/build project will provide family and graduate student housing at the University of Utah on an 11.8-acre site known as the West Village. The project will deliver 298 family apartments (1, 2, and 3 bedroom) totaling approximately 295,000 sq ft and 256 graduate student apartments (studio, 1, 2, and 3 bedroom) totaling approximately 147,000 sq ft, as well as community amenities (shared kitchens, vending, laundry, storage, study, etc.), gathering space (both indoor community rooms and outdoor courtyards), and surface parking. Site utilities and connections must also be included as part of this project. Stakeholders include the University of Utah, (Auxiliary Services, University Student Apartments, Facilities Management), DFCM, current residents in University Student Apartments, the Graduate School, potential donors, and neighboring communities.

Details

,, 442,000 SF - 1 Dormitory, Approximately 295,000 SF New Construction, 1 Dormitory, Approximately 147,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents