Similar Projects
Phase II and III Radium Concrete Trails
Infrastructure
Bidding
Albany, GA

Public Parking Lot and Sanitary Sewer Installation
Infrastructure
Bidding
Duluth, GA 30096

FY17 Sidewalk Gap Project - Phase IV
Post-Bid
$600,000 to $740,000 est. value
Athens, GA 30606

Centralhatchee Parkway Sidewalk
Post-Bid
Centralhatchee, GA

Bemiss Road and Fry Street Sidewalk
Results
Bemiss, GA 31602

St. Marys FY 2020 LMIG Project
Results
Saint Marys, GA 31558

Old Cypress Mill Sidewalk Construction Project - FY22
Infrastructure
Bidding
GA

Lincoln and Washington Street Resurfacing
Post-Bid
Metter, GA 30439

Jekyll Island Beach Crossover Construction
Results
Brunswick, GA 31527

2021 Sidewalk Repairs Dublin Downs and Southampton and Cathy Estates
Infrastructure
Bidding
Less than $25,000 est. value
Tyrone, GA

4th Street Extension/Griffin Street Safety Improvements
Post-Bid
Guyton, GA 31312

Construction of Washington Road Sidewalks
Results
Less than $66,182 est. value
East Point, GA 30344

Shadburn Ferry Road Sidewalk Improvements - CDBG
Infrastructure
Bidding
Buford, GA

Temporary Parking Lot for Building 272
Post-Bid
Robins Air Force Base, GA

Parking Improvements for Parkwood Elementary
Results
Less than $389,357 est. value
Warner Robins, GA 31093

Reported 12/18/2021 12:00 AM
Project Title

Thread Phase 9 Coleman to Hunnicutt

Physical Address View project details and contacts
City, State (County) Lagrange, GA   (Troup County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a side path and greenway trail running through city easements and right-of-ways. Th trail begins at the intersection Hunnicutt Street & Murphy Avenue and terminates at the existing Thread Pocket Park at the Coleman Community Center, near the Northwest intersection of Forrest Avenue & Brownwood Avenue. The project scope includes approximately 5063 LF of concrete trail, trail amenities, & signage. Additional work associated with the project includes minor demolition and clearing, erosion controls and grading

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents