Similar Projects
800 West Concrete Replacement Project
Infrastructure
Bidding
$700,000 est. value
Woods Cross, UT 84010

Department of Workforce Services / Department of Human Services Clearfield Reconstruct Parking Lot
Infrastructure
Bidding
$200,000 est. value
Clearfield, UT 84015

1500 South Trail Crosswalk Construction Project
Alteration
Post-Bid
Less than $75,000 est. value
Woods Cross, UT 84010

Overland Drive Sidewalk
Infrastructure
Post-Bid
North Salt Lake, UT 84054

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

2021 Replacement and New Construction of Sidewalk
Results
$705,064 est. value
Bountiful, UT

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

500 West 2000 South to D Street Extension, Clearfield
Infrastructure
Post-Bid
$1,500,000 to $3,000,000 est. value
UT

Redwood Road Sidewalk at 1100 North
Results
North Salt Lake, UT 84054

380 King Street Improvements
Infrastructure
Post-Bid
$80,000 est. value
Layton, UT 84041

Bonneville Shoreline Design and Construction
Results
UT

Parking Lot and Gutter Sweeping
Infrastructure
Post-Bid
Clearfield, UT

New Neighborhood Park
Results
Less than $1,400,000 est. value
Layton, UT 84041

Layton City New Neighborhood Park
Addition
Results
$1,400,000 est. value
Layton, UT 84041

Orchard Drive Sidewalk at 3800 South
Results
North Salt Lake, UT 84054

Reported 07/06/2022 12:00 AM
Project Title

2022 - 2024 Trails Projects Prequalification

Physical Address View project details and contacts
City, State (County) Bountiful, UT   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

During early 2022, additional corridor master planning work was performed for an overall trails system to update the previous trails planning work. Bountiful City was also awarded a $500,000 grant for trails work. Bountiful City anticipates having 51 miles of new trails and 5 water crossing bridges built by the end of 2024. Trails will create a network for various user groups and ability levels.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents