Similar Projects
Feeder 5 Emergency Electrical Infrastructure Repair
Term Contract, Infrastructure
Design
Harrison Township, Mount Clemens, MI 48045

Chip and Fog Seal and Pavement Markings on Pleasantview Road
Infrastructure
Design
$232,000 CJ est. value
Pellston, MI 49769

Blue Star Highway Bridge Navigation Lighting
Infrastructure
Sub-Bidding
$355,000 CJ est. value
Douglas, MI 49406

Electric Transformer Installation
Renovation
Sub-Bidding
$80,000 CJ est. value
Niles, MI 49120

LED Lighting Conversion and Financing Project
Alteration
Post-Bid
Ithaca, MI 48847

Office of Passenger Transportation - Multiple Solar Powered Facilities, Overhang and Sidewalks
Alteration
Post-Bid
$260,000 est. value
Benton Harbor, MI

Electrical and Roofing Renovations and Locker Purchases
Alteration
Results
Clinton Township, MI

Control Building and Relay Panels
Alteration
Results
Marshall, MI 49068

Automation Upgrade Project
Renovation
Construction
$70,000 CJ est. value
Grand Rapids, MI 49503

Traffic Signal Construction Services
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Meridian charter Township, MI 48864

Ottawa Hills High School Auditorium Lighting Upgrades
Alteration
Post-Bid
Grand Rapids, MI 49506

LED Lighting
Alteration
Results
Clinton Township, MI

Linden Pump Station Generators
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Linden, MI 48451

Dart Auditorium-Replace Air Handling Units, House Lighting, Seats
Alteration
Post-Bid
Lansing, MI

Electric Room Upgrade/Generator Installation
Renovation, Alteration
Results
Flint, MI 48503

Last Updated 07/03/2023 05:01 PM
Project Title

ATCT Standby Generator Replacement

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49017   (Calhoun County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $380,645 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

AIP NO.: 3-26-0008-XX23 The City of Battle Creek will accept sealed bids for the ATCT Generator project. This project consists of the replacement of the existing diesel-powered standby generator for the Air Traffic Control Tower (ATCT) with a new natural gas-powered standby generator. The project will also include installation of natura gas line to new generator, including utility coordination, the replacement of automatic transfer switches, and other electrical work as required for new generator. The project shall be complete and ready for final inspection within Sixty (60) days from the effective date of Notice-to-Proceed. TECHNICAL QUESTIONS OR SITE VISITATION: Bill Ropposch, Mead & Hunt, Inc., 2605 Port Lansing Road, Lansing, MI, (517) 908-3117. Bill.Ropposch@meadhunt.com. BID SUBMITTAL QUESTIONS: Email: Purchasing@battlecreekmi.gov PREVAILING WAGES/DAVIS BACON: Required for this project. See attached wage rates at the end of this document. Contractor shall abide by all the requirements set forth in Section 208.09, PREVAILING WAGES ON CITY PROJECTS, of the City's Administrative Code. Each bid must be accompanied by a standard form bid bond, made payable to the City of Battle Creek, in an amount of not less than five (5%) percent of the base bid submitted. Failure of any accepted bidder to enter into a contract for the work will cause forfeit of the bid security PERFORMANCE/LABOR/MATERIALS BONDS: The accepted bidder will be required to furnish a satisfactory performance bond and labor/materials payment bond, each in an amount equal to 100% of the contract and insurance certificate upon forms acceptable to the City MBE (7.2%), WBE (6.9%), DBE (3%) Replacement of an existing diesel fired standby engine generator with a new natural gas fired standby engine generator. The new natural gas fired standby engine generator is being sized same as the existing generator. Automatic transfer switch(es) are included in this work and are also sized the same as the existing switches being replaced. Contractor shall include in his scope electrical engineering to verify that the size of the generator and transfer switches are adequate and that downstream devices are adequate and coordinated with new equipment. Contractor shall be responsible for the engineering design and installation of a new natural gas line. The gas line work shall be coordinate with the natural gas company (SEMCO). Stamped engineering drawings for the electrical design and gas line shall be submitted prior to ordering of equipment and installation of gas line. This delegation of design shall be included in the contractor's cost for the equipment being installed. Specifications for the new generator and automatic transfer switches are included in this bid package and shall be used as a minimum standard. Reference drawings and specifications from the original design have been included in the bid package for the contractor's use. It is the intention of this project to reuse the existing cabling and pathways for the new generator and switches.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents