Similar Projects
C1DA--VISN 21 Master Planning/Study A/E IDIQ
New Construction, Term Contract
Design
$50,000,000 to $100,000,000 est. value

RFQ - Master Agreement(s) for Architect-Engineer Services
New Construction, Infrastructure
Bidding
$350,000 to $400,000 est. value
Berkeley, CA

Design - Barker Hall, Advanced Bio-Imaging Center - Phase 2
Alteration
Bidding
$650,000 est. value
Berkeley, CA 94709

Engineering, Planning and Development
Post-Bid

RFQ-RS0721-2021 - A-E Services for PSPS Permanent Backup Power Supply Project
New Construction, Term Contract
Post-Bid
Berkeley, CA

GAO Solicitation 05GA0A20Q0004 Architecture Engineering Services
Results
Less than $25,000,000 est. value
Huntsville, AL - Los Angeles, Oakland, CA - Denver, CO - Washington, DC - Atlanta, GA - Chicago, IL - Boston, MA - Dayton, OH - Dallas, TX - Norfolk, VA - Seattle, WA

Feasibility Study for Two New Libraries and Main Library
Infrastructure
Results
Oakland, CA 94612

A and E - On-Call Water Quality Service
Term Contract
Bidding
$4,000,000 to $6,500,000 est. value
Alameda, CA

Project Management Services for The African American Holistic Resource Center
Infrastructure
Post-Bid
Berkeley, CA 94703

Sewer Collection System Hydraulic Model Development, Capacity Evaluation, and Related Studies
New Construction, Infrastructure
Results
Pleasanton, CA

Data Collection and Before and After Performance Assessment for the Solano I-80 Express Lane Project
Infrastructure
Bidding
Oakland, CA 94607

Indefinite Delivery/Indefinite Quantity Contract for Architect-Engineer Services for Geotechnical Engineering Services at Various Government Installations Primarily In The NAVFAC-South
Term Contract
Post-Bid
$2,000 to $15,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Comprehensive Long-Term Environmental Action Navy (C.L.E.A.N.) Contract For Architect-Engineer (A-E) Services
New Construction, Term Contract
Post-Bid
Less than $100,000,000 est. value

Haystack Channel Improvements
Infrastructure
Results

Reported 06/25/2022 12:00 AM
Project Title

Engineering - West Las Positas Boulevard Reconstruction and Pedestrian and Bike Improvements from Foothill Road to Iron Horse Trail

Physical Address View project details and contacts
City, State (County) Pleasanton, CA 94588   (Alameda County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 to $10,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Pleasanton is seeking a consultant team to design the reconstruction and implementation of bike and pedestrian master plan improvements on West Las Positas from Foothill Road to Owens Drive. West Las Positas between Hopyard and Stoneridge has had significant failures of the roadway system and conventional repair strategies have failed. A detailed geotechnical investigation and CCTV inspection of the utilities have been completed. The project will include roadway reconstruction, landscape design, traffic signal and lighting modifications, bike and pedestrian improvements, isolated repairs and modifications of the sewer, water, and storm drain systems. The project is targeted for construction in summer 2024 with an estimated total project cost between $8 to $10 million.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents