Similar Projects
Parking Lot and Trailhead
Post-Bid
Sandersville, GA

Cedar Walk Apartments
Post-Bid
Hinesville, GA 31313

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

GC Services for Peachtree MS Site Access Improvements
Results
Less than $1,000,000 est. value
Atlanta, Dunwoody, GA 30338

Amazon Parking Lot Expansion
Construction
Smyrna, GA

K-12 New Parking Lot
Post-Bid
GA

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Concrete Walkway - Governors Drive
Post-Bid
Forest Park, GA 30297

2019 Parking Lot Rehabilitation
Results
Clarkesville, GA 30523

Blakely Gateway Project
Post-Bid
Less than $800,000 est. value
Blakely, GA 31723

Construction of Streetscape and Atlanta Highway Sidewalk Phase II
Term Contract
Results
Bogart, GA 30622

Cumming City Center, FCHS Parking Lot
Post-Bid
Cumming, GA 30040

Parking Lot at Tom Pittman Field
Results
Aragon, GA 30104

Paving Bids
Post-Bid
Reidsville, GA 30453

Davis Road Sidewalks
Results
Stockbridge, GA 30281

Reported 12/23/2019 01:35 AM
Project Title

Downtown Streetscape and Utility Improvements, Phase II

Physical Address View project details and contacts
City, State (County) Gainesville, GA 30501   (Hall County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 08/19/19
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the following: Furnishing all products and performing all labor necessary for the construction of a the Downtown Streetscape and Utility Improvements Phase II, which generally consists of approximately 2,250 feet of pedestrian streetscape improvements along both sides of Washington Street from the intersection of EE Butler Parkway to Bradford Street, both sides of Bradford Street from Washington Street to Brenau Avenue, the north side of Spring Street from EE Butler Parkway to Bradford Street, and the West side of Green Street between Spring Street and Washington Street. The improvements include new concrete sidewalks, brick pavers, street trees, landscaping, pedestrian lighting, site furnishings, and asphalt paving. Utility improvements in the project area include approximately 825 LF of 8" PVC sanitary sewer pipe, rehabilitation of approximately 230 LF of 8" sanitary sewer with cured in place pipe liner, approximately 125 LF of 6" and 350 LF of 12" ductile iron pipe water mains, and approximately 1250 LF of 18" and 24" reinforced concrete storm drainage pipe. A utility duct bank approximately 900 feet long with also be constructed within the project limits.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents