Similar Projects
La 516: Poland Branch Bridge
Infrastructure
Conception
$1,000,000 CJ est. value
Gibsland, LA 71028

La 516: Poland Branch Bridge
Infrastructure
Conception
$1,000,000 CJ est. value
Gibsland, LA 71028

LA 9 : US 71 - LA 156
Infrastructure
Design
$5,000,000 CJ est. value
Saline, LA 71070

LA 9 : US 71 - LA 156
Infrastructure
Design
$5,000,000 CJ est. value
Saline, LA 71070

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

2022 District 7, 9 Road Improvements
Infrastructure
Results
$2,493,427 CJ est. value
Mandeville, LA 70448

LA 507: Creek Bridges Near Simsboro
Infrastructure
Conception
$5,000,000 CJ est. value
Bienville, LA 71008

Us 80: Ada - LA 154
Infrastructure
Design
$1,000,000 CJ est. value
Gibsland, LA 71028

Surface Treatment
Infrastructure
Post-Bid
Arcadia, LA

New Water Well No.4
Infrastructure
Results
$259,692 CJ est. value
Ringgold, LA 71068

Construction of Contract II - Water Distribution Improvements
Infrastructure
Post-Bid
$263,270 CJ est. value
Ringgold, LA 71068

Last Updated 02/15/2024 07:05 AM
Project Title

Us 371: Red River P/L - Webster P/L

Physical Address View project details and contacts
City, State (County) Bienville, LA 71008   (Bienville County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mill, Patch and Overlay Length 12.02 Parish : Bienville Estimated Cost Range - $10,000,000 to $15,000,000 As of Feb 15, 2024, the project is in Final Planning status. Anticipated letting date is 2024-05-08. LADOT - Us 371: Red River P/L - Webster P/L *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents