Similar Projects
Forrest Avenue Pedestrian Plaza
Infrastructure
Bidding
$850,000 CJ est. value
Hattiesburg, MS 39401

Forrest Avenue Pedestrian Plaza
Infrastructure
Bidding
$850,000 CJ est. value
Hattiesburg, MS 39401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Advanced Metering Infrastructure and Energy Management Information System (AMI-EMIS)
Infrastructure, Alteration
Post-Bid
$160,000 est. value
Hattiesburg, MS 39406

McSwain Water Improvements
Infrastructure
Results
$300,000 est. value
Petal, MS

2021 Additions and Renovations Forrest County School District
Addition, Demolition, Renovation, Infrastructure
Results
$25,124,813 CJ est. value
Hattiesburg, MS 39401

Renovation and Expansion of the Forrest County Health Department
Addition, Demolition, Renovation, Infrastructure
Construction
$5,500,000 CJ est. value
Hattiesburg, MS 39402

38th Avenue Pathway
Infrastructure
Pending Verification
$350,000 CJ est. value
Hattiesburg, MS 39401

Tuscan Sewer Project - City of Hattiesburg
Infrastructure
Pending Verification
$600,000 CJ est. value
Hattiesburg, MS 39401

Install Geomembrane Liner at ASP Camp Shelby Joint Forces Training Center
Infrastructure
Post-Bid
$550,000 CJ est. value
Camp Shelby, MS 39401

Tennis and Pickleball Complex
Infrastructure
Results
$1,776,173 CJ est. value
Hattiesburg, MS 39402

Grace Avenue Bridge Replacement - City of Hattiesburg
Demolition, New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Hattiesburg, MS 39401

Construct Wetlands Crossing Phase I Camp Shelby Joint Forces Training Center (CSJFTC)
Infrastructure
Post-Bid
$500,000 CJ est. value
Hattiesburg, MS 39401

Construct MATES Shed Row 4
New Construction, Infrastructure
Results
$886,000 CJ est. value
Camp Shelby, MS 39401

Lillie Burney Neighborhood Sidewalk Project - City of Hattiesburg
Infrastructure
Pending Verification
$237,000 CJ est. value
Hattiesburg, MS 39401

Last Updated 07/20/2023 03:08 PM
Project Title

Repairs to the Sanitary Sewer System Drainage Basins 10-19

Physical Address View project details and contacts
City, State (County) Camp Shelby, MS 39401   (Forrest County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the partial replacement of the Camp Shelby Sanitary Sewer System. The project will be divided into segments that will be replaced over a number of years beginning in 2023.The project includes new gravity sewer interceptors, new sewer collection lines, new lift stations, and force mains. The project will require the replacement of new 8" to 10" gravity main, new 4" to 12" force main and new lift stations. The new system will use the latest technology available to eliminate infiltration and inflow throughout the system. Required to meet all applicable codes, UFC, and any other state, county, and local code

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents