Similar Projects
City Wide Streetlight Conversion and Streetlight Maintenance
Alteration
Bidding
Kansas City, MO

Harry S Truman Dam and Reservoir Long Shoal Electrical Campsite Upgrade
Alteration
Bidding
$100,000 to $250,000 est. value
Warsaw, MO

Hubbell LED Troffers Lighting
Post-Bid
Saint Louis, MO

Henry County Electrical Improvements - Summer 2021
Post-Bid
Windsor, MO

Electrical Services
Term Contract
Results
Columbia, MO

High Voltage Electrical Services
Results
$100,000 est. value
Jefferson City, MO

Parking Facilities Garage Lighting
Alteration
Bidding
Saint Louis, MO 63108

Led Mongoose Luminaires
Post-Bid
MO

Solar Array, Interior Lighting and Roof Replacement-Trenton Field Maintenance Shop and Readines
Results
Trenton, MO 64683

Three Phase Pad Mounted Transformers
Term Contract
Bidding
Columbia, MO

Led Cobra Luminaires
Post-Bid
MO

Kansas City District Modot Battery Back Up Ups Systems
Results
Lees Summit, MO

Pleasant Valley Nature Preserve Electrical and Water Service Installation
Infrastructure, Alteration
Bidding
Eureka, MO 63025

Solar Panel Removal and Re-Installation
Alteration
Post-Bid
Hillsboro, MO

Led Light Pole Fixtures
Results
Ballwin, MO

Reported 09/16/2021 12:00 AM
Project Title

Emergency Generator Project

Physical Address View project details and contacts
City, State (County) Washington, MO   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To replace emergency generators and transfer switches at two locations. City Hall Location 405 Jefferson Street, Washington, MO 63090 To replace an existing 10kW single phase, natural gas generator and transfer switch with a natural gas generator and transfer switch capable of completely powering the entire building. It is estimated to be a 125 kW generator and 1,200 amp transfer switch, but vendor will verify size of desired equipment on-site. The proposal shall include a remote annunciator as well as wiring to existing Omni metrix wireless reporting equipment. To make the generator dual-fuel to a 25 foot section of flexible gas line to connect to a propane tank that could be brought in to serve the generator. Washington FD Headquarters Location, 200 East 14th Street, Washington, MO 63090 To replace an existing 60 kW three phase dual-fuel, natural gas primary/propane secondary, generator and 200 amp transfer switch with a 100 kW Three phase dual fuel, natural gas primary/propane secondary, generator and 400 amp three phase, 4-wire 120/208 volt transfer switch. The project will also include replacing a 125 amp three phase emergency powered panelboard with a 200 amp 42 circuit three phase panelboard and the transfer of several HVAC breakers and wiring from adjoining existing panel to the new panel. The vendor will verify size of desired equipment on-site. The proposal shall include a remote annunciator as well as wiring to existing Omni metrix wireless reporting equipment.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents