Similar Projects
Reported | 04/04/2020 12:00 AM |
Project Title | Baggage Handling System Operation and Maintenance at Miami International Airport |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33128 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | $11,000,000 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall operate, maintain and repair all inbound and outbound automated and manual sortation BHS and their related equipment at MIA. The Services shall ensure and provide for the sustained performance and safe operation of the subject BHS equipment during the term of the Contract. The Contractor shall operate the BHSs and provide preventive maintenance, corrective maintenance, repair, and system modification, when required; and shall maintain spare parts inventories as well. The Contractor shall support all automated sortation and manual-sortation baggage handling systems 24-hours per day, seven (7) days per week. Preventive maintenance and repairs shall be done in a manner and at a time as to not interfere with the standard operation of the BHSs. The Work to be performed by the Contractor is as follows: 1. Operation, maintenance and repair of all specified inbound and outbound automated sortation and manual-sortation BHSs, and their related equipment. This includes all MIA inbound BHSs at Concourses D, E, F, G, H and J; as well as, all outbound BHSs with the exception of American Airlines’ system, located in Concourse D. 2. Further, the Contractor shall perform other services, including construction, related to the O&M of the BHSs; including but not limited to system modifications, enhancements and repairs, as determined by MDAD, to maintain efficient operations. 3. Part of the requirements for the Contractor shall include obtaining any and all permits required for the operation, maintenance, modifications, enhancements and repairs of the BHSs. 4. The Contractor shall also be required to perform all work listed herein throughout the transition of the new BHS, and in such manner as to not hinder the progress and success of the project (See Section 2.12 and 2.13 for further details). |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |